TILTING EAVE
INSTALLATION INSTRUCTIONS
NOTE: THESE INSTRUCTIONS MUST NOT CONTRAVENE YOUR
LOCAL ELECTRICAL AUTHORITY REGULATIONS, WITH WHICH
ALL INSTRUCTIONS HERE IN MUST COMPLY.
PLEASE KEEP INSTRUCTIONS FOR FUTURE REFERENCE.
For 3W cut a neat 52mm hole with hole saw
For 6W cut a neat 74mm hole with hole saw
Fixture to wired in series:
3W Fixtures require 3Vf @1050mA constant current Max.
6W Fixtures require 6Vf @1050mA constant current Max.
Once electrical connections have been made fold back the
springs and insert through cut hole into the ceiling cavity.
The springs should snap into place and hold the fixture
securely to the surface.
RISK OF FIRE
- Required clearance from structural
members and building elements
SCB= 20mm
HCB= 20mm
Draw power supply cable down through the cut hole and
make a good electrical connection with the fixture input
cables.
See diagram for correct wiring
. Be sure to leave extra
length to allow the fixture to be removed from the ceiling
without disconnection for servicing.
(White)
(Black)
Luminaire input cable
Apply silicone to
groove in the back
of the flange lip