![Huntleigh Tx 150 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/huntleigh/tx-150/tx-150_user-manual_2187030013.webp)
13
6. Daily Check List
The operation of the Tx 150 is simple and straightforward, however, it is
important to make sure the hoist is in good working order before lifting a
client. Following is a Daily Check List which will help to ensure a
problem free lifting operation.
•
Check the hoist moves freely on the castors and the brakes are
functioning.
Note:
Before moving the hoist check it is not plugged
into a wall socket for charging
•
Check the spreader bar is firmly attached to the jib and is free to rotate
and swing.
•
Confirm the hooks on the spreader bar are not excessively worn.
•
Confirm the sling retainers are in place and functioning.
•
Check the keyrings are present and correctly fitted.
•
Check the emergency stop button is operating.
•
Check the actuator raises and lowers.
•
Confirm the mast is fully engaged with the base spigot.
•
Check the mast retaining knob is fully tightened.
•
Confirm the battery alarm is not sounding.
Note:
If the alarm is
sounding place on charge immediately
•
Confirm the leg opening is functioning.
•
Examine the sling for frayed straps, damage or tears to the fabric.
Check stitching, particularly on the strap attachment points.
Note:
If
in any doubt – Do Not use the sling.
•
Check for sharp edges caused by damage, missing parts or wear. Do
not use hoist until hazard has been eliminated.
WARNING:
The hoist should not be used on inclines greater than 5
°°°°
Содержание Tx 150
Страница 1: ...Moving and Handling Products Division ...
Страница 2: ...2 ...
Страница 4: ...4 The Huntleigh Tx 150 Hoist ...
Страница 30: ...30 NOTES ...
Страница 31: ...31 NOTES ...