HunterDouglas Vignette Traversed Скачать руководство пользователя страница 14

INSTALLATION

12

 Secure the Cords — Side Stack

 

Close the shade completely. 

 

Attach the end cap.

 

Loosen the screw on the end cap until it is fl ush with the top of the end cap.

 

Holding the cords below the end cap, push the end cap into place on the end 
of the headrail.

 

The end cap may need to be tapped in place with
a rubber hammer.

 

Locate the two marks on the 

front channel

 of the 

headrail. Hook the cord anchor in between the two marks.

 

Use the provided Allen wrench to tighten the cord anchor 
to secure it to the channel.

IMPORTANT:  

The three cords attached to the cord anchor will still have some slack. Final 

cord adjustment to remove slack will be done later in these instructions. 

 

Tighten the screw on the end cap into the headrail.

 

Proceed to “Operate the Shade” on page 14.

 Secure the Cords — Split Stack

A single cord is shown in the illustrations for 
clarity. Your shade will have three cords.

 

First, slide the cords up the back channel of 
the split stack stop plate, placing them into 
the circular holder.

 

Second, feed the cords into the front 
channel. 

Cord Anchor

in the Front 

Channel

Tighten with 

Allen Wrench

Headrail 

Cut Away

Cord 

Anchor

1

2

Stop

Plate

Cords from

Trike

Содержание Vignette Traversed

Страница 1: ...Installation Operation Care Vignette Traversed with Vertiglide Modern Roman Shades...

Страница 2: ...Tools and Fasteners Needed 3 Installation Installation Overview 4 Unpack the Shade 4 Mount the Installation Brackets 5 Install the Headrail 8 Install the Fabric Into the Headrail 9 Secure the Station...

Страница 3: ...tack Handle Moving Rail Rail Stabilizer Kit Stationary Rail Stationary Rail Hanger Headrail Installation Brackets End Cap End Cap Roller Moving Side Close Up Stationary Side Close Up Trike Vertical Ra...

Страница 4: ...Trikes Stationary Rail Hanger Roller Stationary Rail Hanger Moving Side Close Up Stationary Side Close Up Installation Brackets End Cap End Cap Headrail Trike Rail Stabilizer Kit Rail Stabilizer Kit...

Страница 5: ...alled Tools and Fasteners Needed Allen Wrench Provided Hex Driver Flat blade and Phillips screwdriver Level laser level is recommended Measuring tape and pencil Needlenose pliers Power drill 3 32 dril...

Страница 6: ...acking rail and hangers from the bottom of the shade and discard The bottom is the side without cords or colored tape If You Ordered Returns Optional Follow these two steps if you ordered returns for...

Страница 7: ...lation Brackets Measure and mark the ordered height found on the label inside the headrail plus from the oor surface Install the brackets at this height for the minimum recommended floor clearance Add...

Страница 8: ...n your marks and mark the screw holes A minimum of 11 4 at vertical surface is required to mount the brackets IMPORTANT The brackets should be level and aligned CAUTION The rear of the brackets must b...

Страница 9: ...block Then rotate the installation bracket back to snap it in place IMPORTANT A maximum of one 1 2 spacer block can be used per installation bracket Break off and discard the 1 8 shim Fasten the inst...

Страница 10: ...secure each rail piece Slide the second rail piece onto the joining plate Remove the adhesive from the fabric tab Press the tab into place over the split on the front of the headrail Slip the headrail...

Страница 11: ...uted to the outside of the trike before sliding the trike into the channel Slide the trike into the headrail Split Stack Split stack shades have two trikes Slide each trike into the channel from each...

Страница 12: ...tionary rail hanger so it is just touching the inside of the end cap Hook each of the rollers into the middle channel of the headrail Carefully push back the fabric in order to see each roller Hook th...

Страница 13: ...les Drill the screw holes using a 3 32 drill bit IMPORTANT Use drywall anchors when mounting into drywall Drywall are anchors not provided Fasten the mounting bracket to the surface using the screws p...

Страница 14: ...chor to secure it to the channel IMPORTANT The three cords attached to the cord anchor will still have some slack Final cord adjustment to remove slack will be done later in these instructions Tighten...

Страница 15: ...the cord anchor may have slack The slack in the cords will be addressed later in these instructions Use the provided Allen wrench to tighten the cord anchor into the channel Repeat for the cords on th...

Страница 16: ...ry rail to close the shade Open and close the shade several times If it operates smoothly and there isn t any slack in the cords in headrail proceed to Secure the Cords on page 14 Secure the Cords Sep...

Страница 17: ...ull the cords on the bottom of the stationary rail until you feel a slight resistance Check that the three cords in the headrail have no slack Check that the cord is not pinched Check to ensure all ro...

Страница 18: ...vertical rail end cap until you feel a slight resistance The shade will not t into the installation brackets Check that the installation brackets are level and aligned Be sure the heads of the screws...

Страница 19: ...are available if your shade needs cleaning Dusting Regular light dusting with a feather duster is all the cleaning needed in most circumstances Vacuuming Use a hand held vacuum with low suction for mo...

Страница 20: ...Hunter Douglas window fashion products are covered for defects in materials workmanship or failure to operate for as long as the original retail purchaser owns the product unless shorter periods are p...

Отзывы: