®
14
15
Setting the Run Time (Length of Watering)
1. Press the button until the Run Time icon
is displayed.
2. The display will show the last run time
entered.
3. Use the or button to change the
station run time on the display from 1
minute to 4 hours.
4. Press the button to navigate to the next
station number to be programmed.
Setting Days to Water
1. Push the button until the Water Days
icon is displayed. The station number
will also be displayed.
2. The controller will display seven days of
the week with a icon or a icon above
the numbered day. The icon would
represent an “On” water day, while the
icon would represent an “Off” watering
day.
3. Use the button to navigate to the next
station to be programmed.
Selecting Specific Days of the Week to Water
1. With the cursor on a specific day (the
cursor always starts with day 1), press the
button to activate that day of the week
to water. Press the button to cancel
watering for that day. After pressing a
button the cursor automatically advances to
the next day.
2. Repeat step 1 until all desired days have
been selected. The selected days will show
with a to indicate their status ON. The last
is the last watering day for the program.
Selecting Interval Watering
With this option you can select interval
watering from 1 to 31 days.
1. With the cursor on day 7, press the
button until the
interval watering
icon and the two calendars appear on the
display.
Smart Valve Controller (SVC)
2. Press the or button to select the
number of days between watering days
(1 to 31). This is called the interval.
The controller will water the next Start
Time and will then water at the interval
programmed.
Programming Stations to Operate Together
The SVC-400 allows for automatic watering
of multiple valves at the same time. Up to
four stations can operate at the same time. If
more than one station has the same start time,
they will operate together (they must also be
programmed with the same water day). For
example, if Station 1 and 2 both have been
programmed with start times of 8:00 am, they
will both turn on and run at the same time.
The SVC allows for start time stacking
which is helpful when system capacity is not
adequate to support the operation of multiple
valves at the same time. Let's assume a
scenario in which Station 1 is programmed to
start at 8:00 am and run for 15 minutes, and
Station 2 is programmed to start at 8:10 am
and run for 15 minutes. Station 1 watering run
time overlaps Station 2 start time. The SVC
will wait until Station 1 completes watering
until it starts Station 2. In this scenario, Station
2 will start at 8:15 am.
System Off
This function permits the user to shut the
system off for an indefinite period of time.
1. Press the mode button until the
Crossed Sprinkler icon is displayed.
2. Wait 4 seconds and “Off” will appear on
the display. The SVC is now in the System
Off mode and will remain off until it is
turned back on again.
Содержание SVC-100
Страница 39: ......