Hunter Herald Inset 5 Скачать руководство пользователя страница 8

Press a sufficient amount of fire cement around the base under the stove and the bottom of the 
fireplace opening, ensuring that all joints and connections are well sealed. Then seal up where 
the throat area meets the flue outlet of the stove. This will prevent fumes coming out of the stove 
and going back down behind it. 

Commissioning and Handover 

 
Upon  completion  of  the  installation,  allow  a  suitable  period  of  time  for  any  fire  cement  and 
mortar to dry out.  A small fire may then be lit and checked to ensure the smoke and fumes are 
taken from the stove up the chimney and emitted safely to atmosphere.  Do not run the stove at 
full output for at least 24 hours. 
 
On completion of the installation and commissioning, ensure that the operating instructions and 
operating  tools for  the  stove  are  left  with  the customer.    Be  sure  to advise  the  customer  on the 
correct use of the appliance  with the fuels likely to be used on the stove  and warn them to  use 
only the recommended fuels for the stove. 
 
Advise the user on what to do should smoke or fumes be emitted from the stove.   
 
The user should be warned to use a fireguard to BS 6539 in the presence of children, aged and/or 
infirm persons. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Herald Inset 5

Страница 1: ...son must carry out the installation of this appliance alternatively your local Building Control Officer can approve the completed installation should a non accredited engineer undertake the installati...

Страница 2: ...installation Fire surround back panels suitable for solid fuel are usually in three sections and slabbed Many fire surrounds are suitable only for use with gas and electric fires and therefore not sui...

Страница 3: ...g Baffle To assemble these Fire Bricks simply reverse the above procedure Remove all central single width Grate Bars and outer Triple width grate bars below the brick Take hold of the front of the Sid...

Страница 4: ...cal building control department must approve the installation Scheme Web address Telephone APHC Association of Plumbing and Heating Contractors Certification Limited www aphc co uk 02476 470 626 Build...

Страница 5: ...t met the chimney should be lined by a suitable method The chimney must be swept before connection to the stove Where the chimney is believed to have previously served an open fire installation it is...

Страница 6: ...replace recess should be made of non combustible material Allow an apron of a least 300mm at the front of the stove and 150mm on either side The hearth on which the stove is to be placed should not be...

Страница 7: ...replace opening being careful not to damage the hearth or paintwork on the body of the stove Once the stove is in position carefully drill into the existing fireback through the three fixing holes usi...

Страница 8: ...d checked to ensure the smoke and fumes are taken from the stove up the chimney and emitted safely to atmosphere Do not run the stove at full output for at least 24 hours On completion of the installa...

Страница 9: ...supply for combustion and ventilation The primary and secondary air inlets must be kept clear from obstruction and blockage Air Controls Primary Air The Sliders in each Door control the Primary air T...

Страница 10: ...e you operate your stove to its maximum heat output This is to allow the paint to cure in steadily and to give a long service life of the paint finish During this curing in process you may notice an u...

Страница 11: ...ing Solid Mineral Fuel The stove can be banked up for extended burning When burning solid fuel empty the ashpan Open air controls and let the fire burn brightly for a short period Refuel and close bot...

Страница 12: ...ty notes for your guidance FIRES CAN BE DANGEROUS Always use a fireguard in the presence of children the elderly or the infirm The fireguard should be manufactured in accordance with BS 6539 Fireguard...

Страница 13: ...urning rate by closing all air controls Move furniture and rugs away from the fireplace and remove any nearby ornaments Place a fireguard or spark guard in front of the stove Feel the chimney breast f...

Страница 14: ...ld be avoided as these can scratch the glass and make subsequent cleaning more difficult Wet logs on heated glass a badly aimed poker or heavy slamming of the doors could crack the glass panels The gl...

Страница 15: ...the chimney for potential obstructions before lighting the stove Gaskets All gasket used on this appliance are produced from a heat resistant material called Manniglas The glass gasket will have to be...

Страница 16: ...oor HHR06 080 Glass Clip HHR08 046 Glass Clip Screw FSJM05008SS Door Glass HH06 083 Glass Gasket HH06 084 Door Slider HHR06 098 Slider Knob HHR08 045 Door Slider HHR06 098 Slider Knob HHR08 045 Door G...

Страница 17: ...5 007 Riddling Bar Lower HCR06 020 Riddling Bar Upper HCR06 019 Recouping Baffle HHN05 024 Rear Brick M F HHN05 018 Riddling Support HHN05 015 Catch Bar Drop in HH06 085 Ashpan HHN05 017 Triple Grate...

Отзывы: