Hunter 49
5.13
Fuel System
DA
N
G
E
R
!
!
CA
UTION
!
!
California Proposition 65
Diesel Engine Exhaust and some of it’
s compo-
nents are known by the state of California to cause cancer
, birth defects, and other reproduc-
tive harm.
Leaking fuel is a fire and explosion hazard.
Avoid
serious injury or death from fire or explosion.
NO SMOKING
Keep both sight gauge valves closed except when checking fuel level.
Do not mistake the water fill, waste pumpout, or even a rod holder for the Fuel Fill, ensure you are placing fuel in the correct deck fitting.
Before starting the engines, open the engine com- partment and check for fuel smell.
*If you smell fuel, do not start the engine; get everyone off the boat and get trained help to find and fix the problem.
The “Fuel System” chapter 5, and “Boating Safety” chapter 4 both contain important fuel related information. T
ake the time to read all the
fuel related information in your Operator
’s
Manual, Owner
’s Manual, as well as the O.E.M.
manuals.
Содержание 49
Страница 1: ...Operator s Operator s Manual Manual Hunter50 Hunter50 V 052410 P N 1031357 ...
Страница 2: ......
Страница 9: ...V 052410 P N 1031357 Introduction Introduction Hunter 50 Hunter 50 Chapter 1 Chapter 1 ...
Страница 14: ...Hunter 50 Introduction 1 6 Notes ...
Страница 15: ...V 052410 P N 1031357 and Documents Documents Forms Forms Hunter 50 Hunter 50 Chapter 2 Chapter 2 ...
Страница 26: ...Hunter 50 Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Страница 27: ...Hunter 50 Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Страница 30: ...Hunter 50 Documents and Forms Power Squadron recommendations for maintenance and safe boating 2 16 ...
Страница 31: ...Hunter 50 Documents and Forms 2 17 Local sailing club or marina s recommendations for maintenance and up keep ...
Страница 33: ...Hunter 50 Documents and Forms 2 19 Spare Parts List ...
Страница 34: ...Hunter 50 Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Страница 35: ...Hunter 50 Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Страница 36: ...Hunter 50 Documents and Forms Notes 2 22 ...
Страница 37: ...DC 071609 Limited Limited Warranty Warranty Chapter 3 Chapter 3 ...
Страница 38: ...This Page Intentionally Left Blank Hunter Limited Warranty 3 2 ...
Страница 47: ...V 052410 P N 1031357 Boating Boating Safety Safety Hunter 50 Hunter 50 Chapter 4 Chapter 4 ...
Страница 63: ...Hunter 50 Boating Safety 4 17 General Boat Arrangements ...
Страница 65: ...Hunter 50 Boating Safety 4 19 Notes ...
Страница 66: ...Hunter 50 Boating Safety 4 20 This Page Intentionally Left Blank ...
Страница 68: ...Hunter 49 4 22 Ventilation Air Conditioning ...
Страница 69: ...V 052410 P N 1031357 Fuel Fuel Systems Systems Hunter 50 Hunter 50 Chapter 5 Chapter 5 ...
Страница 75: ...Fig 5 7 A Quick Fuel Filter Reference Hunter 50 Fuel Systems 5 7 ...
Страница 80: ...Notes Hunter 50 Fuel Systems 5 12 ...
Страница 82: ...Hunter 49 5 14 W A R N I N G W A R N I N G W A R N I N G LPG Liquifi ed Petroleum Gas LInes Layout ...
Страница 83: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Underwater Underwater Gear Gear Chapter 6 Chapter 6 ...
Страница 91: ...Hunter 49 6 9 Thru Hulls Port and Stbd GENERATOR EXHAUST ...
Страница 92: ...Hunter 49 6 10 Bottom Thru Hulls ...
Страница 93: ...V 052410 P N 1031357 Hunter 50 DC Electric DC Electric Systems Systems Chapter 7 Chapter 7 ...
Страница 102: ...Hunter 50 DC Electric 7 10 Notes ...
Страница 103: ...Hunter 49 7 11 12 Volt DC Lighting ...
Страница 105: ...Hunter 49 7 13 DC Hull Harness ...
Страница 106: ...Hunter 49 7 14 DC Hull Harness cont ...
Страница 107: ...V 052410 P N 1031357 Hunter 50 AC Electric AC Electric Systems Systems Chapter 8 Chapter 8 ...
Страница 114: ...Hunter 50 AC Electric Systems 8 8 Notes ...
Страница 116: ...Hunter 49 AC Electric Systems 8 10 Notes ...
Страница 117: ...V 052410 P N 1031357 Hunter 50 Water Water Systems Systems Chapter 9 Chapter 9 ...
Страница 126: ...Hunter 49 9 10 A C System Cooling Water Raw Water C AU TIO N ...
Страница 127: ...V 052410 P N 1031357 Hunter 50 Waste Waste Systems Systems Chapter 10 Chapter 10 ...
Страница 135: ...Hunter 49 10 9 Bilge Pump Layout ...
Страница 137: ...Hunter 49 10 11 C AU T I O N Waste System Grey Water ...
Страница 138: ...Hunter 49 Waste and Sanitation Systems 10 12 Notes ...
Страница 139: ...V 052410 P N 1031357 and Engines Engines Transmissions Transmissions Chapter 11 Chapter 11 Hunter 50 Hunter 50 ...
Страница 146: ...Hunter 49 11 9 Exhaust System ...
Страница 147: ...V 052410 P N 1031357 and Sails Sails Rigging Hunter 50 Hunter 50 Chapter 12 Chapter 12 ...
Страница 153: ...Hunter 50 Sails and Rigging 12 7 C A B D E F G H J K I H A B C D E F G ...
Страница 156: ...Hunter 50 Sails and Rigging 12 10 MAINSHEET PURCHASE LAYOUT BOOM WITH REEFING LAYOUT Boom and Mainsheet Purchase Layout ...
Страница 157: ...Hunter 50 Sails and Rigging 12 11 ROPE VANG DETAILS STANDARD RIGID VANG FURLING OPTION Boom Vang Details ...
Страница 164: ...Hunter 50 Sails and Rigging 12 18 ...
Страница 165: ...Hunter 50 Sails and Rigging 12 19 Self Tacking Jib Sheet ...
Страница 166: ...Hunter 50 Sails and Rigging 12 20 Mainsheet Traveler ...
Страница 167: ...Hunter 50 Sails and Rigging 12 21 Arch Installation ...
Страница 168: ...Hunter 50 Sails and Rigging 12 22 ...
Страница 169: ...Hunter 50 Sails and Rigging 12 23 ...
Страница 170: ...Hunter 50 Sails and Rigging 12 24 ...
Страница 171: ...Hunter 50 Hunter 50 Getting Getting Underway Underway Chapter 13 Chapter 13 ...
Страница 178: ...Hunter 50 Getting Underway 13 8 Notes ...
Страница 179: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Maintenance Chapter 14 Chapter 14 ...
Страница 191: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Glossary Glossary Chapter 15 Chapter 15 ...