Hunter 50 • Documents and Forms
2.4
Preliminary care and maintenance checklist
A qualified Technician should be used if you are not completely confident in your ability to
make repairs or inspections.
Out of Water Inspection
Pre-launch inspection
____ Sacrifi cial zinc anodes installed
____ Propeller installed with keyway, nuts and cotter pin
____ Propeller shaft turns freely and without excess wobble
____ Struts and shaft log free of corrosion
____ Rudder swings easily & correct with wheel direction
____ Rudder and post inspected for cracks and/or concealed damage (may require removing rudder)
____ Auxiliary tiller handle properly aligned, fi ts securely and operational
____ All thru-hulls and valves below water line inspected for corrosion, labeled and closed until after launch
____ Bottom paint in satisfactory condition
____ Hull freshly cleaned and waxed (free of gelcoat damage)
____ Mooring, safety lines and fenders onboard and in good condition
____ House & engine start batteries installed and fi lled with correct electrolyte levels
____ House & engine start battery boxes secured
____ All battery terminals clean and wires secured
____ Engine block & transmission drains closed
____Speed / Depth transducers in place. Speed paddle wheel rotates smoothly
____ Hose clamps on all systems below water line tight
____ Keel bolts tight and clean
____ Exhaust hose attached and secured
____ Boat is free of internal and external water leaks above water line
(Failure to stop water intrusion could result in permanent damage or deterioration of structural coring materials, internal wiring and cause mildew and molding)
Mast Assembly
____ Review manufacturers manual for maintenance and up-keep
____ Spreaders securely fastened
____ Mast and spreaders free of corrosion and stress cracks
____ Standing rigging and pins inspected for wear, tear, corrosion and cracking
____ External wiring secured for anchor, steaming and deck lights
____ Electronic wind indicator installed per manufacturers recommendation
____ Manual wind indicator installed on masthead
____ VHF antenna installed and connected
____ Headsail furling system installed inspected per manufacturers recommendation
____ Running rigging inspected for wear and tear
____ Mast step stand-up blocks secured and operational
____ Main Sail, jib sail and fl aking system inspected for wear and tear (non-furling mast).
____ In- mast system checked for smooth operation and overall condition of sails
____ Specifi ed pre-bend and diagonal tensions attained in mast. See owners manual
____ Mast to deck wiring properly sealed with drip loop
Содержание 49
Страница 1: ...Operator s Operator s Manual Manual Hunter50 Hunter50 V 052410 P N 1031357 ...
Страница 2: ......
Страница 9: ...V 052410 P N 1031357 Introduction Introduction Hunter 50 Hunter 50 Chapter 1 Chapter 1 ...
Страница 14: ...Hunter 50 Introduction 1 6 Notes ...
Страница 15: ...V 052410 P N 1031357 and Documents Documents Forms Forms Hunter 50 Hunter 50 Chapter 2 Chapter 2 ...
Страница 26: ...Hunter 50 Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Страница 27: ...Hunter 50 Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Страница 30: ...Hunter 50 Documents and Forms Power Squadron recommendations for maintenance and safe boating 2 16 ...
Страница 31: ...Hunter 50 Documents and Forms 2 17 Local sailing club or marina s recommendations for maintenance and up keep ...
Страница 33: ...Hunter 50 Documents and Forms 2 19 Spare Parts List ...
Страница 34: ...Hunter 50 Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Страница 35: ...Hunter 50 Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Страница 36: ...Hunter 50 Documents and Forms Notes 2 22 ...
Страница 37: ...DC 071609 Limited Limited Warranty Warranty Chapter 3 Chapter 3 ...
Страница 38: ...This Page Intentionally Left Blank Hunter Limited Warranty 3 2 ...
Страница 47: ...V 052410 P N 1031357 Boating Boating Safety Safety Hunter 50 Hunter 50 Chapter 4 Chapter 4 ...
Страница 63: ...Hunter 50 Boating Safety 4 17 General Boat Arrangements ...
Страница 65: ...Hunter 50 Boating Safety 4 19 Notes ...
Страница 66: ...Hunter 50 Boating Safety 4 20 This Page Intentionally Left Blank ...
Страница 68: ...Hunter 49 4 22 Ventilation Air Conditioning ...
Страница 69: ...V 052410 P N 1031357 Fuel Fuel Systems Systems Hunter 50 Hunter 50 Chapter 5 Chapter 5 ...
Страница 75: ...Fig 5 7 A Quick Fuel Filter Reference Hunter 50 Fuel Systems 5 7 ...
Страница 80: ...Notes Hunter 50 Fuel Systems 5 12 ...
Страница 82: ...Hunter 49 5 14 W A R N I N G W A R N I N G W A R N I N G LPG Liquifi ed Petroleum Gas LInes Layout ...
Страница 83: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Underwater Underwater Gear Gear Chapter 6 Chapter 6 ...
Страница 91: ...Hunter 49 6 9 Thru Hulls Port and Stbd GENERATOR EXHAUST ...
Страница 92: ...Hunter 49 6 10 Bottom Thru Hulls ...
Страница 93: ...V 052410 P N 1031357 Hunter 50 DC Electric DC Electric Systems Systems Chapter 7 Chapter 7 ...
Страница 102: ...Hunter 50 DC Electric 7 10 Notes ...
Страница 103: ...Hunter 49 7 11 12 Volt DC Lighting ...
Страница 105: ...Hunter 49 7 13 DC Hull Harness ...
Страница 106: ...Hunter 49 7 14 DC Hull Harness cont ...
Страница 107: ...V 052410 P N 1031357 Hunter 50 AC Electric AC Electric Systems Systems Chapter 8 Chapter 8 ...
Страница 114: ...Hunter 50 AC Electric Systems 8 8 Notes ...
Страница 116: ...Hunter 49 AC Electric Systems 8 10 Notes ...
Страница 117: ...V 052410 P N 1031357 Hunter 50 Water Water Systems Systems Chapter 9 Chapter 9 ...
Страница 126: ...Hunter 49 9 10 A C System Cooling Water Raw Water C AU TIO N ...
Страница 127: ...V 052410 P N 1031357 Hunter 50 Waste Waste Systems Systems Chapter 10 Chapter 10 ...
Страница 135: ...Hunter 49 10 9 Bilge Pump Layout ...
Страница 137: ...Hunter 49 10 11 C AU T I O N Waste System Grey Water ...
Страница 138: ...Hunter 49 Waste and Sanitation Systems 10 12 Notes ...
Страница 139: ...V 052410 P N 1031357 and Engines Engines Transmissions Transmissions Chapter 11 Chapter 11 Hunter 50 Hunter 50 ...
Страница 146: ...Hunter 49 11 9 Exhaust System ...
Страница 147: ...V 052410 P N 1031357 and Sails Sails Rigging Hunter 50 Hunter 50 Chapter 12 Chapter 12 ...
Страница 153: ...Hunter 50 Sails and Rigging 12 7 C A B D E F G H J K I H A B C D E F G ...
Страница 156: ...Hunter 50 Sails and Rigging 12 10 MAINSHEET PURCHASE LAYOUT BOOM WITH REEFING LAYOUT Boom and Mainsheet Purchase Layout ...
Страница 157: ...Hunter 50 Sails and Rigging 12 11 ROPE VANG DETAILS STANDARD RIGID VANG FURLING OPTION Boom Vang Details ...
Страница 164: ...Hunter 50 Sails and Rigging 12 18 ...
Страница 165: ...Hunter 50 Sails and Rigging 12 19 Self Tacking Jib Sheet ...
Страница 166: ...Hunter 50 Sails and Rigging 12 20 Mainsheet Traveler ...
Страница 167: ...Hunter 50 Sails and Rigging 12 21 Arch Installation ...
Страница 168: ...Hunter 50 Sails and Rigging 12 22 ...
Страница 169: ...Hunter 50 Sails and Rigging 12 23 ...
Страница 170: ...Hunter 50 Sails and Rigging 12 24 ...
Страница 171: ...Hunter 50 Hunter 50 Getting Getting Underway Underway Chapter 13 Chapter 13 ...
Страница 178: ...Hunter 50 Getting Underway 13 8 Notes ...
Страница 179: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Maintenance Chapter 14 Chapter 14 ...
Страница 191: ...V 052410 P N 1031357 Hunter 50 Hunter 50 Glossary Glossary Chapter 15 Chapter 15 ...