QUICK S
TAR
T GUIDE
6
If you purchased multiple load cells and/or transducers with
your machine, they will either be mounted and calibrated, or
in the case of more than four (4) load cells/transducers, cali-
brated and assigned to a specific input, but not mounted.
All instrument connectors will be marked to indicate what
input channel was used in their calibration. Ensure that the
instruments are connected to the indicated channels when
setting the machine up for use. Please note that if you are
using the HM-5820 in conjunction with Humboldt’s NEXT
testing software, the calibrations will need to be imported
into the software before use.
Below are photos of an instrumentation input and the
instrumentation plug. Install the plugs into the inputs by
lining up the guide at the bottom of the plug with the slot
at the bottom of the input.
Instrumentation Input
Instrumentation Plug
Third-party instrumentation, which is compatible, can also
be used with the HM-5820. If you plan to use third-party
load cells, please refer to the Equipment Setup section of
this manual, page 30 for instructions.
Содержание HM-5820-150.3F
Страница 1: ...product manual 07 22 Automated Pressure Controller with Load Frame HM 5820 3F ...
Страница 27: ...Equipment Setup 27 ...
Страница 43: ...Test Setup 43 ...