List of Tools required:
2 People
Drill
7/8
”
x 8”
Drill Bit
15/16
”
Driver bit or wrench(s)
Nails or Woodscrews (Galvanized)
Hammer
Framing Square
Bubble Level
Measuring Tape
Pencil
(8) 4ft+ Long Scrap 2x4 for use as temporary bracing.
1)
Layout Post Anchors
On Level ground mark location of the 4x included post anchors. Ensure that diagonal
measurements are equal to maintain square dimensions.
2)
Secure Post Anchors
Install Post anchors in marked location. Consult Simpson installation instructions for proper
procedure.