SEITE 21
MONTAGEANLEITUNG
TV-Elemente
TYP 4133, 4135, 4138, 4139, 4153, 4155, 4158, 4159,
4143, 4145, 4148, 4149, 4163, 4165, 4168, 4169
TV UNITS
ELEMENTS POUR TV
TV-ELEMENTEN
MONTAGE · ASSEMBLY ·
MONTAGE · MONTAGE
Perforated brick
with a dense
structure
(Pressure
resistance
> 10.0 N/mm²)
Attention! The nature of the wall must be checked carefully by
qualified personnel
before assembly. Assembly may then only be carried out by
qualified persons
who carefully observe
these assembly instructions. The plastic TOX plugs PSD-SL 8 x 90mm from the fittings carton are only suitable, if the quality of the wall and the pressure resistance levels meet those
stated in the following table. The unit must not be assembled on light walls or masonry. In all other cases it is essential that a different and appropriate type of mounting is chosen
by a
qualified person
. hülsta cannot be held responsible for the correct choice of a different method of mounting. During assembly please also make sure that there are no electrical
installations or other utility lines near the mounting area. This must be checked using an appropriate search device. Please note that plastic pipes will not be detected.
The mounting brackets included in the fittings carton are only suitable for the following types of wall. Please note that the pressure resistance levels must under no circumstances
fall below those stated.
PSD-SL Ø 8x90
DIN 571 / 6x100
DIN 125 / 6.4
Concrete
Solid brick
Solid sand-lime brick
>/= C20/25
Pressure resistance
>/= 20 N/mm²
DIN 1045/1
ETAG 001
Concrete and solid
brickwork
Mz 12
Pressure resistance
>/= 12 N/mm²
DIN 105
DIN EN 771-1
KS 12
KSL 12
Pressure resistance
>/= 12 N/mm²
DIN 106
DIN EN 771-2
Hammer (Impact) drilling: Drilling with a hammer drill (high setting, better
drilling progress) for holes which need to be of a high quality. Suitable for solid
walls with a dense structure (concrete, etc). Holes must always be thoroughly
cleared of any drilling remains afterwards.
Percussion drilling: Drilling with a percussion drill (low setting) for brickwork
of a dense structure (solid bricks, solid sand-lime bricks). Holes must always
be thoroughly cleared of any drilling remains afterwards.
Vertical coring
brick
Concrete precision
block
Perforated sand-
lime brick
HIz 12
Pressure resistance >
10 N/mm²
DIN 105-1
PNE
Pressure resistance >
10 N/mm²
Z-17.1-636
ST 9
Pressure resistance >
10 N/mm²
DIN 105-1
Rotary drilling: With a normal power drill,
without percussion
setting in per-
forated bricks (so that the connecting sections do not break and the hollow
section become too large). Holes must always be thoroughly cleared of any
drilling remains afterwards.
Rotary drilling: With a normal power drill,
without percussion
setting in porous
concrete. Holes must always be thoroughly cleared of any drilling remains
afterwards.
Solid brick
with a porous
structure
Porous concrete
Pressure resistance
>/= 2,5 N/mm²
Depth of drilled hole
The hole itself must be deeper than the depth of anchoring. The extra space is
required to take the screw, which must always protrude beyond the tip
of the wall plug, especially in the case of plastic plugs.
Depth of drilled hole
Anchoring depth
Screw length
Recommended kind of drilling:
Carton of fittings for now! 7 TV-unit for wall
Mat.-Nr.: 1411985
12x
/16x
12x
/16x
12x
/16x