H
P 10 PUMP USER’S MANUAL
Page33
METALLIC CHECK VALVE (BALL & SEAT) MAINTENANCE METALLIC
Shut off the suction line and discharge line of the pump before
starting the maintenance work.Then shut the compressed air supply,
discharge the pressure in the pipe and remove the compressed air
connection.Discharge the fluid in the pump.Now the pump can be
disassembled for the maintenance.
Remove the manifold to have access to the check valves.
Inspect the check balls for any abrasion, cuts or corrosion
marks.Perform the same checks on the check valve seats to see any
cuts, abrasion and any foreign materials embedded onto the
surfaceof
both
the
external
and
internal
chambers.The
sphericalsurface of the check balls must seat flush to the surface of
the check valveseats for the pump to operate to peak efficiency.
The damaged or worn out
parts should be replaced as
necessary.Re-assemble
the parts of the check
valves.The seat should fit
into thecounter bore of the
outer chamber. Assemble
the
pump
and
make
necessary
connections.
The pump is ready for
operation.
WARNING
: The air supply should be switched off
before any repair or maintenance of the pump. Then
pump pressure should be released and air
connection be removed. Be carefulcompressed air
line.
Item No.
Part No.
Name of Part
Qty
2
S021030
Discharge Line
1
5
S041047
Check Ball
4
6
S051045
Check Ball Seat
4
4
S031030
Outer Chamber
2
1
S011030
Suction Line
1
Содержание HP 10
Страница 1: ...HP 10 PUMP USER S MANUAL Page 1 USER MANUAL HP 10 PLASTIC METAL PUMPS ...
Страница 6: ...HP 10 PUMP USER S MANUAL Page 6 PACKING DIMENSIONS mm A B C 390 350 550 ...
Страница 7: ...HP 10 PUMP USER S MANUAL Page 7 COMPOSİTE PARTS DRAWING OF HP 10 1 METALLIC PUMP ...
Страница 12: ...HP 10 PUMP USER S MANUAL Page12 PACKING DIMENSIONS mm A B C 390 390 550 ...
Страница 13: ...HP 10 PUMP USER S MANUAL Page13 COMPOSİTE PARTS DRAWING OF HP 10 1 PLASTIC PUMP ...