![Hudson River Westpoint Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/hudson-river/westpoint/westpoint_operating-and-installation-instructions-manual_2181608028.webp)
28
MAINTENANCE - continued
Door Removal and Replacement:
If glass is broken, once unit has cooled, and making sure to wear gloves, carefully
remove any loose pieces of glass from the door frame. Replace only with ceramic glass
obtainable from the dealer.
Task Maintenance
Schedule
Burn Pot
check daily
Combustion Chamber
weekly
Heat Exchanger Tubes
bi-weekly
Ash Pan
bi-weekly or every 10 bags of fuel
Convection Fan Blades
annually
Combustion Fan Blades
annually
Hopper
bi-weekly or every 10 bags of fuel
Venting System
annually
Glass as
needed
Gaskets annually