background image

Содержание 4540-10

Страница 1: ...Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 1 A Assembly Instructions Mini M Swing Art 4540 10 Operator ______________________________...

Страница 2: ...parts list with part numbers 7 4 Erection instructions 10 5 Post installation checks 15 B Maintenance Instructions 17 6 Introduction Maintenance 18 7 General maintenance information 19 8 Specific main...

Страница 3: ...pare parts that may be required can be obtained directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions...

Страница 4: ...technical views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer...

Страница 5: ...mended by manufacturer 3 Name and overall dimension of the largest component Steel post 2 pieces length 2 40 m 100 mm 4 Name and weight of the heaviest component Steel posts 1 piece approx 18 kg 5 Int...

Страница 6: ...case of sandy and soft soils the surface measure of foundations have to be enlarged for about 50 7 Assembly time once foundations completed 1 2 hour Required assistants 1 person 8 Any spare parts whi...

Страница 7: ...sing 1 1 Swing part 2 2 Steel post 100 mm 2 40 m lg 100 2 Ring shackles for 100 mm 101 2 Threaded bolts M10 x 110 mm galv 102 4 Nut M10 galv 103 2 Caps for 100 mm 104 6 Self drilling pias screws 5 5 x...

Страница 8: ...allation Instructions 2012 2013 4540_10 01 en 010 doc 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 0 90m 2 2 100 mm 2 40 m lg 100 2 for 101 6 mm 101 2 M10 x 110 mm gal...

Страница 9: ...ny seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 9 Pos Quantity Symbol 112 2 M8 Pre assembled 113 2 fo...

Страница 10: ...hnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 10 Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 4 Erection I...

Страница 11: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 11...

Страница 12: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net 12 Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc...

Страница 13: ...Huck Seiltechnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 13...

Страница 14: ...ening of the swing joint only and has to be removed subsequently The swing joints have to be fixed with Pos 107 108 and 109 then Picture B FR Foundation radius at least 10 cm G Drainage F Fall protect...

Страница 15: ...nstalled safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5...

Страница 16: ......

Страница 17: ...4 A lar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 17 B Maintenance Instructions...

Страница 18: ...ce with EN 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare p...

Страница 19: ...s that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All sp...

Страница 20: ...and put safety at risk Therefore loose screws should always be tightened and checks carried out to ensure that there are no missing screws e g look out for holes you can see through 7 12 Preventing e...

Страница 21: ...n of the equipment 8 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive us...

Страница 22: ...on of the equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive u...

Страница 23: ...echnik GmbH 35614 A lar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4540_10 01 en 010 doc 23 Regular Ma...

Страница 24: ...e and replace if necessary 10 6 Check rubber parts sleeves etc for wear and tear or damage and replace if necessary 10 7 If necessary remove excess padding maaaterial from the post footings due to dan...

Страница 25: ...Maintenance 13 Annual maintenance 13 1 Ascertaining that the equipment foundations and surfaces are safe for operation 13 2 In particular the equipment should be checked for decay and corrosion It ma...

Страница 26: ..._____________________ Location ________________________________________________________________________________________ Customer or operator ___________________________________________________________...

Страница 27: ......

Страница 28: ..._________________________________________________ ______________________________________________________________ Competent person in charge ____________________________________________________________...

Отзывы: