
Page
16
of
30
Q.E.D. ENVIRONMENTAL SYSTEMS LIMITED -
Cyan Park - Unit 3, Jimmy Hill Way, Coventry. CV2 4QP.
UNITED KINGDOM
Tel: +44 (0)333 800 0088
E-Mail:
Web:
www.qedenv.com
REGISTERED IN ENGLAND AND WALES NO. 1898734
OMLASERONE Iss. 01
Recharging the Battery Pack
The LASER ONE (SEM5000) is supplied with its rechargeable battery pack (PBLO.NNNN.YY 3,7V 4Ah Code
205014). The charging of the battery is done only using the external adapter CCLO (code 100189) and the
power supply (Code 423007). Connect the charger with the power supply according the figure below, using
the two polarity connectors in conformity with the maximum authorized voltage Um equal to 15V.
The battery charge cycle typically takes 4.5 Hrs, a red led will be on during the charge cycle which
when complete will change to green to indicate a full charge. The battery level indicator on the
LASER ONE consists of three segments, the last of which indicates that there is approximately 30
minutes of power remaining.
The typical operational time from a full charge is 10 hours at an ambient temperature of 20°C and
with the backlight ON.
Advice about the use of lithium ion technology:
In order to optimize the use and the lifetime of your battery, please, follow the following guidelines:
Charge the battery with a temperature between the range [+10°; +30°C]
Allow the battery to reach a complete discharge as frequently as possible
Store in a dry place at a temperature preferably not exceeding 30°C
Central supply connector – Um=15V.
Prosoft Comms
For Service Only
Warning:
Do not charge the device in a hazardous area OR only charge in a non-hazardous, safe
area.
Содержание Laser One
Страница 1: ...OPERATING MANUAL...