Hubbell CE110 Скачать руководство пользователя страница 7

OUTER SHELL AND INSULATION 

The tank is encapsulated in 1-inch thick fiberglass insulation. The tank and insulation is 
protected by a painted steel protective jacket.  
 

TEMPERING VALVE (Optional)

 

An optional tempering valve may be supplied to increase the amount of available hot water. 
The ½” NPT valve is adjustable from 100° - 130° F and is typically used when supplying hot 
water to multiple lavatories from a single CE110. 
 

WALL BRACKET (Optional)

 

An optional wall bracket is available for easy mounting 
of the heater. 
 

 
 
 

SECTION II

 – INSTALLATION GUIDELINES

 

 

WARNING / CAUTION 

 
DO NOT TURN ON THE ELECTRIC POWER SUPPLY to this equipment until heater is 
completely filled with water and all air has been released. 

If the heater is NOT filled with 

water when the power is turned on, the heating elements will burn out.

 

 
For protection against excessive pressures and temperatures, local codes require the 
installation of a temperature-and-pressure (T&P) relief valve certified by a nationally 
recognized laboratory that maintains periodic inspection of production of listed equipment of 
materials, as meeting the requirements for Relief Valves and Automatic Gas Shutoff for Hot 
Water Supply Systems. ANSI Z21.22-1971. A relief valve is designed to discharge 
excessively hot water. THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY 
AND PERSONNEL FROM HARM WHEN THE VALVE FUNCTIONS. 
 
All water heaters have a risk of leakage at some unpredictable time. IT IS THE 
CUSTOMER'S RESPONSIBILITY TO PROVIDE A CATCH PAN OR OTHER 
ADEQUATE MEANS, SO THAT THE RESULTANT FLOW OF WATER WILL NOT 
DAMAGE FURNISHINGS OR PROPERTY. 

 

The warranty provided assures replacement within its terms, but specifically does not 
warrant against consequential damage caused by failure to follow these instructions. 
 

UNPACKING AND INSPECTING THE HEATER 

1.

 

Remove the model CE110 from the shipping carton and visually inspect for any sign 
of damage. A damaged unit should not be installed, but returned to the factory for 
replacement. 
 

WATER HEATER PLACEMENT 

 

Locate the heater in a clean, dry location nearest to the point of most frequent hot 
water use. 

 

Secure the water heater. Optional wall mounting brackets may be utilized, if supplied. 

 

The water heater should be protected from freezing and waterlines insulated to reduce 
energy and water waste. 

 

Leave sufficient room to service the heater. 

 

Do not install in an area where flammable liquids or combustible vapors are present. 

 

 

7

Содержание CE110

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER BASE MODEL CE110 2009 Edition...

Страница 2: ...93 INTERNET http www hubbellheaters com IMPORTANT Always reference the full model number and serial number when calling the factory The following information should be noted at time of installation an...

Страница 3: ...d casualties always turn the power supply safety switch to off turn the charge or ground the circuit before performing any maintenance or adjustment procedure 7 This appliance is designed to store wat...

Страница 4: ...OF CONTENTS SECTION TITLE PAGE I GENERAL INFORMATION 6 II INSTALLATION GUIDELINES 8 III SCHEDULED MAINTENANCE AND OPERATION 14 IV TROUBLESHOOTING 16 V SERVICING AND REPLACEMENT OF PARTS 17 VI WARRANTY...

Страница 5: ...s heavy gauge steel finished with high gloss enamel Insulation consists of high density fiberglass blankets Temperature Pressure Safety Relief Valve Hot Water Outlet Cold water inlet not shown on bott...

Страница 6: ...overflow line should be utilized from the relief valve outlet to a floor drain See drawing for locations and sizes HEATING ELEMENT The water heater is supplied with either a 1000 watt or a 450 watt e...

Страница 7: ...r Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 A relief valve is designed to discharge excessively hot water THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY AN...

Страница 8: ...alve and tank or in the drain line FILLING THE HEATER 1 Completely close the drain valve 2 Open the highest hot water faucet to allow all air to escape from piping 3 Open the valve to the cold water i...

Страница 9: ...ld water line f Hot water line connected to hot water outlet on tank g Temperature and pressure relief valve installed h Relief valve overflow line installed i Water heater filled with water j Power l...

Страница 10: ...ION WITHOUT TEMPERING VALVE Piping to Hot Water Piping from Cold Water Air Gap Drain Valve Relief Valve Discharge Pipe Temperature Pressure Relief Valve Support Bracket bottom bracket not shown Floor...

Страница 11: ...TH TEMPERING VALVE Piping to Hot Water Tempering Valve Support Bracket bottom bracket not shown Air Gap Floor Drain Relief Valve Discharge Pipe Temperature Pressure Relief Valve Piping from Cold Water...

Страница 12: ...ly clicks off draw water from heater c Measure the maximum temperature with an accurate thermometer d If the temperature is above the safe limits for your circumstances call a service man to adjust or...

Страница 13: ...mit switch tripped Reset high limit switch Loose wires Tighten wires Torque screws per torque chart included in Section VI Heating element inoperable Check heating element operation by clamping an Amp...

Страница 14: ...screws 5 Replace control and install new high limit switch by performing above steps in reverse order refer to wiring diagram in Section II Torque screws per chart in back HEATING ELEMENT 1 Disconnect...

Страница 15: ...all access cover 13 Fill tank and check around element for any leaks THERMOSTAT 1 Disconnect power from unit 2 Remove access cover and locate thermostat 3 Disconnect the two 2 control wires Wires Capi...

Страница 16: ...e to relieve pressure in tank 4 Disconnect overflow piping 5 Unscrew relief valve remove assembly and replace with new one 6 Connect overflow piping 7 Turn on incoming water supply and check for leaks...

Страница 17: ...the Company TANK REPLACEMENT POLICY TEN YEARS This section outlines the ten year limited replacement policy for tanks that fail due to the corrosive effects of water Duration Ten years from date of or...

Страница 18: ...y term of this agreement and will not extend beyond that one year limitation The parts of this warranty including the incorporated users manual that speaks specifically to terms and condition are deem...

Страница 19: ...NOTES 19...

Страница 20: ...P O BOX 288 STRATFORD CT 06615 0288 PHONE 203 378 2659 FAX 203 378 3593 INTERNET http www hubbellheaters com 20...

Отзывы: