Hubbell CE110 Скачать руководство пользователя страница 3

WARNING / CAUTION 

 

1.

 

Please read all instructions prior to installing water heater. 

2.

 

Tank is to be completely filled with water and all air is to be vented before energizing. 

3.

 

Due to the rigors of transportation, all connections should be checked for tightness before 
heater is placed in operation. 
 

4.

 

Safety relief valve must be installed in tapping provided. 
 

5.

 

The refractory material used in heating elements may absorb some moisture during 
transit, periods of storage, or when subjected to a humid environment. This moisture 
absorption results in a cold insulation resistance of less than twenty (20) megohms. If this 
heater has been subjected to the above condition, each heating element must be checked 
for insulation resistance before energizing. A low megohm condition can be corrected by 
removing the terminal hardware and baking the element in an oven at 350°F -700°F for 
several hours or until the proper megohm reading is obtained. 
 

6.

 

KEEP AWAY FROM LIVE ELECTRICAL CIRCUITS.  
Do not perform any maintenance, make any adjustments, or replace any components 
inside the control panel with the high voltage power supply turned on. Under certain 
circumstances, dangerous potentials may exist even when the power supply is off. To 
avoid casualties, always turn the power supply safety switch to off, turn the charge or 
ground the circuit before performing any maintenance or adjustment procedure. 
 

7.

 

This appliance is designed to store water heated only by the electrical elements 
provided, at temperature of not more then 125°F and pressures of not more than 150 
psi. Heat input from any external or additional source will void the warranty. 
 

8.

 

The design anticipates the proper installation and care in use of the product. There is a 
risk of property damage and personal injury inherent in these of any hot water system. 
The Company cannot supervise the installation and therefore make it a specific 
condition of the warranty that the customer will supervise the installation and use of 
this product to be sure they are performed in accordance with safe guidelines and 
proper local or national codes. Generalized instructions and procedures cannot 
anticipate all situations. For this reason, only qualified installers should perform the 
installations. A qualified installer is a person who has licensed training and a working 
knowledge of the applicable codes regulation, tools, equipment, and methods necessary 
for safe installation of an electric resistance water heater. If questions regarding 
installation arise, check your local plumbing and electrical inspectors for proper 
procedures and codes. If you cannot obtain the required information, contact the 
company. 

  

 

3

Содержание CE110

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER BASE MODEL CE110 2009 Edition...

Страница 2: ...93 INTERNET http www hubbellheaters com IMPORTANT Always reference the full model number and serial number when calling the factory The following information should be noted at time of installation an...

Страница 3: ...d casualties always turn the power supply safety switch to off turn the charge or ground the circuit before performing any maintenance or adjustment procedure 7 This appliance is designed to store wat...

Страница 4: ...OF CONTENTS SECTION TITLE PAGE I GENERAL INFORMATION 6 II INSTALLATION GUIDELINES 8 III SCHEDULED MAINTENANCE AND OPERATION 14 IV TROUBLESHOOTING 16 V SERVICING AND REPLACEMENT OF PARTS 17 VI WARRANTY...

Страница 5: ...s heavy gauge steel finished with high gloss enamel Insulation consists of high density fiberglass blankets Temperature Pressure Safety Relief Valve Hot Water Outlet Cold water inlet not shown on bott...

Страница 6: ...overflow line should be utilized from the relief valve outlet to a floor drain See drawing for locations and sizes HEATING ELEMENT The water heater is supplied with either a 1000 watt or a 450 watt e...

Страница 7: ...r Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 A relief valve is designed to discharge excessively hot water THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY AN...

Страница 8: ...alve and tank or in the drain line FILLING THE HEATER 1 Completely close the drain valve 2 Open the highest hot water faucet to allow all air to escape from piping 3 Open the valve to the cold water i...

Страница 9: ...ld water line f Hot water line connected to hot water outlet on tank g Temperature and pressure relief valve installed h Relief valve overflow line installed i Water heater filled with water j Power l...

Страница 10: ...ION WITHOUT TEMPERING VALVE Piping to Hot Water Piping from Cold Water Air Gap Drain Valve Relief Valve Discharge Pipe Temperature Pressure Relief Valve Support Bracket bottom bracket not shown Floor...

Страница 11: ...TH TEMPERING VALVE Piping to Hot Water Tempering Valve Support Bracket bottom bracket not shown Air Gap Floor Drain Relief Valve Discharge Pipe Temperature Pressure Relief Valve Piping from Cold Water...

Страница 12: ...ly clicks off draw water from heater c Measure the maximum temperature with an accurate thermometer d If the temperature is above the safe limits for your circumstances call a service man to adjust or...

Страница 13: ...mit switch tripped Reset high limit switch Loose wires Tighten wires Torque screws per torque chart included in Section VI Heating element inoperable Check heating element operation by clamping an Amp...

Страница 14: ...screws 5 Replace control and install new high limit switch by performing above steps in reverse order refer to wiring diagram in Section II Torque screws per chart in back HEATING ELEMENT 1 Disconnect...

Страница 15: ...all access cover 13 Fill tank and check around element for any leaks THERMOSTAT 1 Disconnect power from unit 2 Remove access cover and locate thermostat 3 Disconnect the two 2 control wires Wires Capi...

Страница 16: ...e to relieve pressure in tank 4 Disconnect overflow piping 5 Unscrew relief valve remove assembly and replace with new one 6 Connect overflow piping 7 Turn on incoming water supply and check for leaks...

Страница 17: ...the Company TANK REPLACEMENT POLICY TEN YEARS This section outlines the ten year limited replacement policy for tanks that fail due to the corrosive effects of water Duration Ten years from date of or...

Страница 18: ...y term of this agreement and will not extend beyond that one year limitation The parts of this warranty including the incorporated users manual that speaks specifically to terms and condition are deem...

Страница 19: ...NOTES 19...

Страница 20: ...P O BOX 288 STRATFORD CT 06615 0288 PHONE 203 378 2659 FAX 203 378 3593 INTERNET http www hubbellheaters com 20...

Отзывы: