![Huazheng HZNZ-100 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/huazheng/hznz-100/hznz-100_manual_2179951009.webp)
6
test.
2) If automatic test every time change on test clip the instrument will test
automatically don’t need manual click.
Pole quantity setting. According to poles quantity to set.
Test mode:
1) Test the connection strip resistance.
2) Select “test connection strip” If don’t test select “test on pole”.
Test item:
1) Test voltage and internal resistance together.
2) Just test voltage no internal resistance.
3) Test all voltage firstly then test internal resistance.
It’s unnecessary to set float charging voltage, current, temperature won’t affect test.
Third step
:
Finish setting.
Connect instrument and test line. Clip the test clips on
battery (pay attention on pole. Red is positive and black is negative) Click “Start test”
Click “Yes”.
Forth step: test process
After finishing test of first battery, remove test clip to next battery( firstly remove test
clip on the negative pole and then remove test clip on the positive pole ; Or remove
two clips simultaneously ).
Oper Mode:
1. “ Manual”, click “Start “ test next battery .
2. “ Auto” the instrument test automatically after 1-2s , user don’t click “ start “ .
Fig.3.1-1 Start test
Fifth step: end of test:
Finish the test. Click “Return” to the main interface. If the