4
Ground-falult locator
Locator’s current clamp
(1) Analyzer
Power switch: place the switch on ‘ON’; connect working power supply;
power indicator light lights up.
Bus-bar/ branch: when place the switch on ‘bus-bar’, the instrument detect
bus-bar (it will detect through bridge measurement method); when place the