background image

11

Picture 12

Convenient for data storage, generation and sharing.

(8) Help menu function

Background brightness

modify background brightness, idle time and brightness of idle.

Cable connection diagram

guide and train onsite operating of cable connection.

Time settings

calibrate system time of tester.

Maintenance

Factory enter the page to key in password to do maintenance. Unser is not

allowed enter it.

Related picture 13~14,

Picture 13

Picture 14

Содержание HZ2363

Страница 1: ...HZ2363 Three Phase Contact Resistance Tester Huazheng Electric Manufacturing Baoding Co Ltd ...

Страница 2: ...anual and operate and maintain the instrument according to the manual to prolong its service life Just a light press the test will be completed automatically is the operating characteristics of this instrument If you are satisfied with this instrument please tell your colleagues if you are not satisfied with this instrument please call 0312 6775656 to tell you to serve you at all times Baoding Hua...

Страница 3: ...iple 2 V Panel Description and Wire Connection 4 VI Operating Procedure 5 VII DC Constant Current Source Function 12 VIII Mobile Phone Control and Data Transfer BT communication 12 IX Failure Analysis and Trouble Shooting 14 X Attentions 14 XI Transportation and Storage 14 XII Packing list 15 ...

Страница 4: ...sion quadruple integral A D converter 7 Latest System IC Use High performance 32 bit latest ARM chips System automatically switch magnification times based on signal ensure testing precision 8 Inside Calendar Clock provide accurate time of testing and printing 9 DC constant current source function Can output current from 0 to infinite value built in current step by step up flow test equal to anoth...

Страница 5: ... customized 20A 50A 100A 150A 200A 300A 400A customized 20A 50A 100A 150A 200A 300A 400A 500A customized 20A 50A 100 A 150 A 200 A 300 A 400 A 500 A 600 A cust omiz ed Current customize d 1 two phase 2 three phas e Test range 0 19999 expandable Test precision 0 5 rdg 10dgt Resolution 0 01 Working power AC 220V 10 50Hz 2 Length m m 450 450 Width mm 250 250 Height mm 220 280 Weight Kg 9 9 12 9 Envir...

Страница 6: ...rce have two end I I called I shape supply current for being tested resistance Rx current value can be read by amperemeter I voltage of Rx V V called V shape read by voltmeter V So to calculate resistance value by the measurement of I and V ...

Страница 7: ...gative Three phase connecting post is separately for A B and C A is yellow B is green C is red Touch color screen 800 480 pixel dot matrix touch color LCD screen very visible under sunshine and dark environment Thermal printer Build in a thermal printer in the tester Thermal paper can be used for data printing on one side can not on the other side Only around three months recording on the thermal ...

Страница 8: ...ded with product shipment VI Operating Procedure Normal operating process is shutdown cable connection power on settings test data storage printing shutdown and remove cable totally it is 7 setp 1 Cable connection Under shutdown status please connect GND cable power cable test cable Refer to the cable connection diagram in help menu Tighten the big current clamp small current clamp must tight touc...

Страница 9: ...d normal temperature resistance average value converted normal temperature resistivity average value Left down parameters zone Set three output current range test time resistance up limit alarm value being tested resistance length and section area Right down test zone 1 three buttons stands corresponding each test data of three current range Green stands for having data black shows no data Selecte...

Страница 10: ...ters in system not impact by power off and re open Current test times and output current In the interface to set current times stands for different current range to calculate average value can select I1 I1 I2 I1 I2 I3 I1 is only for output I1 current test I1 I2 is for output I1current test first and then output I2 current test I1 I2 I3 is for output I1 current test first then output I2 current tes...

Страница 11: ... select stop actual temperature is preset temperature If select customized temperature sensor and select start actual temperature is real in testing Background selection and traditional and simplified forms of Chinese characters Set screen color to image text blue and black If select simplified then do not show converted data in main interface Test remark Press test remark button to enter picture ...

Страница 12: ...a Thermal paper can be used for data printing on one side can not on the other side Only around three months recording on the thermal paper not for long time storage 7 Document open and management In the main interface press open menu of function menu to enter interface as picture 9 Picture 9 The interface shows page number total number and selected item document name is called by real time Click ...

Страница 13: ...ar to clear out all files Insert U disk then show U disk inserted reminding press export to convert file to WORD inside U disk Already exported file shows UP means not be re exported see picture 11 Picture 11 File named by test real time and store as picture 12 ...

Страница 14: ...ground brightness idle time and brightness of idle Cable connection diagram guide and train onsite operating of cable connection Time settings calibrate system time of tester Maintenance Factory enter the page to key in password to do maintenance Unser is not allowed enter it Related picture 13 14 Picture 13 Picture 14 ...

Страница 15: ... up current process Firstly take initial current value output keep timing to periodical time value then add step current value output Again keep timing to periodical time value and then add step current value output repeat the cycling process to output current over max current value finally finish the whole output current In the test can press interruption to stop whole test process VIII Mobile Ph...

Страница 16: ... in password 1234 to connect it Connect blue tooth successfully then use APP to control tester Like click test stop upload store etc after upload and store picture 23 25 shows Picture 23 Picture 24 File is stored in data catalog and named by real test time for convenient storage report generation and data sharing ...

Страница 17: ...ture proof dry and clean room 3 Do not disassemble and revise the tester or else caused electric shock risk 4 Do not repair and self revise or else it is not the guarantee period 5 Do read the user manual in details before using XI Transportation and Storage Transportation While transport product recommend use our provided package wooden case and damping stuff in case of damage during delivery los...

Страница 18: ...15 XII Packing list NO Name Quantity 1 Black Test Line 3 2 Power Line 1 3 Print Paper 1 4 Black Test Line 3 5 Ground Lead 1 6 Fuse 2 ...

Отзывы: