![HUAYUAN LG-125HA Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/huayuan/lg-125ha/lg-125ha_manual-instruction_2179864013.webp)
7
the torch with binding posts on ignition which marked with”arc striking”, and screw up the nut;
Figure 4 the dimension and size of the arc ignition
10.
The connection of compressed air and the operation of pressure regulating filter(The function of pressure
regulating filter, please check the figure 5)
Figure 5
The pressed air must accord with the requirement as in “
三
” of 2, connect the air hose with the inlet valve on
plasma. The operation of pressure regulating filter: when regulate the pressure, pull up the regulating screw first,
then rotate it, rotate left to reduce the air pressure and rotate right to increase the air pressure, after regulating,
press the screw return.