HUAWEI VP9660
Quick Start Guide
2 Installing the VP9660
Issue 04 (2013-12-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5
Table 2-2
Installation tools
Tool
Name
Description
Phillips
screwdriver
Tightens and loosens screws.
Diagonal pliers
Cuts cables and cable ties.
Measuring tape
Measures distance.
Multimeter
Measures the resistance, voltage,
and conductivity.
Electrostatic
discharge (ESD)
wrist strap
Prevents ESD damage when you
touch or operate devices or
components.
ESD gloves
Prevents ESD damage when you
insert, remove, and hold a
mainboard or precision device.
Cable tie
Bundles cables.
Illustrations listed in
2.3 Unpacking
To ensure that you have received all the components of the VP9660 in good condition,
perform the following steps for acceptance: