EchoLife OT925-G
User Guide
Tables
Issue 02 (2007-08-30)
Huawei Technologies Proprietary
xxxiii
Item
Description
Bundle signal cables or optical fibers moderately at the turning.
The routing of signal cables and optical fibers complies with the
engineering design, with equal space between cable ties.
Signal cables and optical fibers are routed smoothly.
All signal cables and optical fibers are arranged and bundled neatly,
without any damage on the cable or fiber sheath.
Signal cables,
optical fibers
Proper margins are reserved for signal cables and optical fibers.
Cable ties are cut smooth without any sharp edge or crossover.
Checking Installation Environment
0 provides the checklist of the installation environment.
Checklist of the installation environment
Item
Description
The installation position of the device complies with the engineering
design.
The device is installed reliably, in compliance with the shockproof
requirements in the engineering design.
Device
All bolts are fastened correctly and reliably.
Cabling trough
No sundries such as cable ties or cable segments can be found
around the device or the cabling trough. All parts are smooth and
clean.
2.6
Power-on Check
This section describes how to power on and check the OT925-G after the installation.
Powering On the OT925-G
Before powering on the OT925-G, ensure that the installation meets the requirements.
Use the multimeter to check whether the input current is in the allowed range (100–240 VAC).
Turn on the power switch of the OT925-G.
----End
Checking LED Status
Check whether the OT925-G can be powered on normally according to the LED status, as shown in
0.