3
1. Move the UPS to the installation position and open the front door of the power cabinet.
2. Install the connecting plates between the bypass cabinet and its adjacent power cabinet based
on the following sequence: bottom, top, and middle connecting plates.
Channel steel installation: M12x60 bolts
Floor installation: M12x60 expansion bolts
(1) Mounting hole on the floor
(2) Mounting hole on the channel steel
3. Secure the UPS.