background image

13

2. After verifying  the installation,  reinstall  all 

the covers.

3. (Remove  the paper  protective  film from the 

sealing  putty.)  After routing  cables  and 
verifying  cable  connections,  seal  the gap 
between  cables  and the  cabinet  using 
sealing  putty. 

Dustproof  cover 

4. Do not remove  the dustproof  cover  before 

power-on  to prevent  dust inside  the UPS.

Sealing  putty

Sealing  putty  must be used  as a whole  and 

the gap  can be sealed  only  from the  top. 

Paper 

protective  film 

5

Powering On and Starting the UPS

1. Before  powering  on the UPS, ensure  that  the UPS has passed  all check items in the 

UPS5000 

Commissioning  and Acceptance  Report

and  Chapter  4.

2. Measure  the voltage  and frequency  of the  UPS upstream  input switch. The line voltage  range  is 

138

–485  V AC, and the frequency  range  is 40–70  Hz.

Powering On the UPS

5.1

Close  the upstream  bypass  and mains  input  switches.

(Full configuration  model)  Close  the UPS bypass  input switch, output  switch, and  mains input switch.

After the UPS is powered  on, initialization  begins.  The MDU displays  the  Huawei  logo  and  an 

initialization  progress  bar.

Содержание UPS5000-E-200K-FM

Страница 1: ...0 kVA 150 kVA 200 kVA 330 kg 2000 mm x 600 mm x 850 mm UPS5000 E 200K FM 390 kg UPS5000 E 200K SM UPS5000 E 200K FM 1 Power distribution subrack cover 2 Bypass input switch 3 Maintenance bypass switch 4 Main input switch 5 Output switch 6 CM 7 Bypass module 8 Power modules 9 MDU 10 Filler panels 1 Power modules 2 Bypass module 3 Control module CM 4 Power distribution subrack cover 5 Filler panels ...

Страница 2: ...stallation 1 Determine the position for installing the cabinet Mark mounting holes based on the drawings unit mm 1 Before installation read the user manual carefully to get familiar with product information and safety precautions 2 Use insulated tools during installation and operation 3 Only Huawei engineers or engineers certified by Huawei are allowed to install commission and maintain the UPS Ot...

Страница 3: ...f the cabinet by using a wrench until all the four castors at the bottom hang in the air and the leveling feet bear the whole cabinet weight 7 Insert four M12x115 expansion bolts into the expansion bolt holes in the floor and tighten the expansion bolts 6 Remove the four rubber plugs from the bottom of the cabinet two on the front and two at the back Non Secured Installation ...

Страница 4: ...rom the cabinets to prevent scraps from falling inside Cable scraps may ignite and cause personal injury or device damage After cables have been installed clean the cabinets in a timely manner Keep the cabinets and surrounding environment clean and tidy You need to prepare terminals onsite The stripped length of the copper wire should be the same as that of the part of the terminal that covers the...

Страница 5: ...ower source skip this step The cover can be opened only if the maintenance bypass switch is OFF 4 Connect the ground cable to the UPS In the preceding figure circled wiring terminals are primary ones and must connect to the ground cable 1 Remove the small covers of the cabinet top Connecting Cables 3 2 Connecting Cables to the UPS5000 E 200K SM Scenario 1 Routing Cables from the Top ...

Страница 6: ...2L1 2L2 and 2L3 respectively Connect the N wires of the mains and bypass input cables to the input power distribution terminal N Route a neutral wire from the middle of the positive and negative battery strings Take a battery string consisting of 40 batteries as an example A neutral wire is routed from the middle of positive and negative battery strings each consisting of 20 batteries NOTE 7 Conne...

Страница 7: ... the copper bars between mains input terminals and bypass input terminals 3 Remove small covers from the bottom based on site requirements 4 Connect power cables For the screw specifications and torque used for connecting cables in a bottom cable routing scenario refer to the top cable routing scenario This section only shows the cable routes in the bottom cable routing scenario NOTE 5 Connect sig...

Страница 8: ...er distribution subrack Scenario 1 Routing Cables from the Top 1 Remove a certain number of small covers from the top of the cabinet based on site conditions 4 Connect the ground cable to the UPS 3 Remove the copper bars between mains input terminals and bypass input terminals ...

Страница 9: ... a neutral wire from the middle of the positive and negative battery strings Take a battery string consisting of 40 batteries as an example A neutral wire is routed from the middle of positive and negative battery strings each consisting of 20 batteries NOTE 7 Connect the battery cable ...

Страница 10: ...ermine the installation position for the cable entry cabinet and draw mounting holes in the installation position based on drawings 2 Remove the right and rear covers from the UPS cabinet and remove the front and rear covers from the cable entry cabinet Put away the removed screws and covers 3 Adjust the anchor bolts of the cable entry cabinet to make it flush with the UPS cabinet 4 Install equipo...

Страница 11: ...all an equipotential plate 9 Remove a certain number of small covers from the bottom of the cable entry cabinet based on site conditions 10 Remove the signal cable trough cover from the cable entry cabinet If the cable entry cabinet is placed on the left of the UPS cabinet remove the cable trough for signal cables and install it on the right of the cable entry cabinet NOTE ...

Страница 12: ...able based on the actual situation NOTE For the screw specifications and torque used for connecting cables in a bottom cable routing scenario refer to the top cable routing scenario NOTE 4 Verifying the Installation 1 Check that there is no foreign matter in the cabinet 1 Cabinet top 2 Wiring terminal blocks 3 Switches 4 Cabinet rear ...

Страница 13: ...p Paper protective film 5 Powering On and Starting the UPS 1 Before powering on the UPS ensure that the UPS has passed all check items in the UPS5000 Commissioning and Acceptance Report and Chapter 4 2 Measure the voltage and frequency of the UPS upstream input switch The line voltage range is 138 485 V AC and the frequency range is 40 70 Hz Powering On the UPS 5 1 Close the upstream bypass and ma...

Страница 14: ...rom the LCD on the Offline Activation screen Tap Generate PWD to generate a startup password Set Site and Device Type as required and tap Offline Activation Enter the generated password in the password textbox on the LCD to start the UPS Use the app to start the UPS online Yes No start the UPS offline On the app home screen tap StartUp to access the Set Startup screen If the UPS is powered on for ...

Страница 15: ... is working in bypass mode System User LCD Preset Password WebUI Preset Password admin system administrator 000001 Changeme operator common user 000001 Changeme To ensure system security change the LCD and WebUI passwords after the first login NOTE 1 On the main menu choose Common Functions and tap Inv ON 2 In the displayed login window enter the user name and password and tap 3 In the displayed d...

Страница 16: ... alarm disappears from the MDU 2 After confirming that the battery strings are properly connected turn on the battery string input circuit breaker If there are multiple battery strings turn on the circuit breaker for each battery string and then turn on the general circuit breaker between battery strings and the UPS The No battery alarm disappears from the MDU 3 Turn on the UPS downstream output s...

Страница 17: ... China www huawei com Scan here for more documents You can also log in to Huawei technical support website http support huawei com enterprise http support huawei com Support Support E WeChat Scan here for technical support enterprise Scan here for technical support carrier Huawei App Store Huawei App Store ...

Отзывы: