Figure 9-21
Installing optical fibers
Step 3
Lay out the cables according to the instructions in
and
Step 4
Attach labels to the installed cables by referring to Attaching an L-Shaped Label.
----End
9.8 Installing Monitoring Signal Cables
This chapter describes the procedures and precautions for installing monitoring signal cables.
Procedure
Step 1
Connect one end of the monitoring signal cable to
ALM1
to
ALM4
ports on the UIM02C.
TP48200A
Installation Guide
9 Installing Cables
Issue Draft B (2014-01-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
51