TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
7 Installing Cables
Issue 01 (2013-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
67
7.4 Installing the TCUA Power Cable
Procedure
Step 1
Route the TCUA power cable into the cabinet through the package entry module.
Step 2
Connect one end of the power cable to the PWR port on the TCUA in the battery cabinet.
Step 3
Secure the negative power cable on the other end to the corresponding DC output circuit
breaker.
Step 4
Secure the positive power cable on the other end to the appropriate screws on the RTN+
busbar, as shown in