TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
7 Installing Cables
Issue 01 (2013-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
62
----End
7.2.5 Installing a Communications Cable Between the Battery
Cabinet and the Power Cabinet
Installing a Communications Cable for One Battery Cabinet
Step 1
Route a communications cable into the battery cabinet and power cabinet through the package
entry modules in the cabinets.
Step 2
Connect one end of the communications cable to the COM.IN port on the TCUA in the
battery cabinet.
Step 3
Connect the other end of the communications cable to the COM port on the UIM02C in the
power cabinet, as shown in