Figure 5-24 Connecting cables to the smart power sensor (balanced
three-phase grid connection)
NO TE
ɲ /Êä²ÊªäÊà²ÑäȀ쯲Êüàìàäààßñ²àìÑÑÊÊììÑì¯ÉʪÉÊì
system through a Smart Dongle.
ɲ /Êì¯Ýà²ÊªÊìýÑàÀ²ÊªȀì¯^kEǂǀǀǀäàäÊäñÝÝÑàì쯪à²ȝì²
point control function to achieve zero export.
ɲ /©ì¯^kEǂǀǀǀäàßñ²àä쯪à²ȝì²ÝѲÊìÑÊìàÑéñÊì²ÑÊȀì¯ăÊìÑ
connected to a smart power sensor.
ɲ /Êì¯äÊà²ÑÑ©ÃÊì¯àȝݯäªà²ÑÊÊì²ÑÊȀ²©ì¯^kEǂǀǀǀäàßñ²àä
the grid-tied point control function, they need to be connected to a three-phase
smart power sensor to control the total three-phase power.
ɲ KÊÃăÑÊ>'ììàă²ääñÝÝÑàìȀÊì¯>'ììàăÉñäìÑÊÊììÑì¯
inverter installed with the Smart Dongle.
Procedure
Step 1 Connect signal cables to corresponding signal connectors.
NO TICE
ɲ Êäñàì¯ìì¯ÝàÑìì²ÑÊÃăàÑ©ì¯Ã²ä²Êì¯ÑÊÊìÑàȇf¯äñàÝÃñä
core should be cut Ñč from the protection layer.
ɲ Êäñàì¯ìì¯ĂÝÑäÑà²äìÑìÃÃă²Êäàì²ÊìÑì¯Ã¯ÑÃȇ
ɲ Êäñàì¯ìì¯ä²ªÊÃÃäàÑÊÊìäñàÃăȇ
ɲ Êäñàì¯ìì¯ÃäàÊÑììý²äìȇ
ɲ /©ÉñÃì²ÝÃ䲪ÊÃÃäÊìÑÑÊÊììÑä²ÊªÃÑÊÊìÑàȀÊäñà
that the outer diameters of the signal cables are the same.
SUN2000-(2KTL-6KTL)-L1
User Manual
5 Electrical Connection
Issue 03 (2020-09-15)
Copyright © Huawei Technologies Co., Ltd.
53