background image

23

2. Connect to the solar inverter WLAN and log in as 

installer

to access the device commissioning 

screen.

Resetting the Password

7.2

1. Ensure that the SUN2000 connects to the AC and DC power supplies at the same time. 

Indicators       and       are steady green or blink at long intervals for more than 3 minutes.

2. Perform the following operations within 3 minutes:

a. Turn off the AC switch and set the DC switch at the bottom of the SUN2000 to OFF. Wait 

until all the LED indicators on the SUN2000 panel turn off.

b. Turn on the AC switch and set the DC switch to ON. Ensure that the indicator      is blinking 

green at long intervals.

c. Turn off the AC switch and set the DC switch to OFF. Wait until all LED indicators on the 

SUN2000 panel are off.

d. Turn on the AC switch and set the DC switch to ON.

a. Wait until the indicator      blinks green at long intervals.

b. Obtain the initial WLAN hotspot name (SSID) and initial password (PSW) from the label 

on the side of the SUN2000 and connect to the app.

c. On the login screen, set a new login password and log in to the app. 

3. Reset the password within 10 minutes. (If no operation is performed within 10 minutes, all  

inverter parameters remain unchanged.) 

4. Set router and management system parameters to implement remote management.

Содержание SUN2000-17KTL-M0

Страница 1: ...SUN2000 8KTL 20KTL M2 Quick Guide HUAWEI TECHNOLOGIES CO LTD Issue 03 Part Number 31500BCA Date 2020 07 10 ...

Страница 2: ...e grid tied PV power system and local regulations 4 Before installing the device check that the package contents are intact and complete against the packing list If any damage is found or any component is missing contact your dealer 5 Use insulating tools when installing the device For personal safety wear proper personal protective equipment PPE 6 Huawei shall not be liable for any consequences c...

Страница 3: ...2 Installation Requirements 2 1 Dimensions 2 Installing the Equipment Two M6 screw holes are reserved on both left and right sides of the inverter for installing an awning Space Angle ...

Страница 4: ... for solid concrete walls For other types of walls prepare bolts by yourself and ensure that the wall meets the load bearing requirements of the inverter Loosen the nuts flat washers and spring washers of the two expansion bolts Moving an Inverter Level 2 Optional Install the screw for locking the DC switch The screws for DC switches are delivered with solar inverters According to Australian stand...

Страница 5: ...sted pair cable Conductor cross sectional area 0 2 1 mm2 0 5 mm2 is recommended Cable outer diameter 4 11 mm 5 Optional RS485 power meter signal cable 6 Optional Rapid shutdown switch signal cable 7 Optional Grid scheduling signal cable Five core outdoor cable Connect cables in accordance with the local installation laws and regulations Before connecting cables ensure that the DC switch on the inv...

Страница 6: ...und terminal after the PE cable is connected Installing the AC Output Power Cable 3 3 Ensure that the protection layer of the AC output power cable is inside the connector the core wires are totally inserted into the cable hole and the cable is connected securely Failing to do so may cause device malfunction or damage The hex key is delivered with the inverter and bound to the hanging kit at the b...

Страница 7: ... core AC output power cable to an AC connector A three core AC output power cable can be connected similarly The three core cable L1 L2 and L3 is not connected to the neutral wire or PE wire A four core or five core AC output power cable can be connected similarly The four core cable L1 L2 L3 and PE is not connected to the N wire and the four core cable L1 L2 L3 and N is not connected to the PE wi...

Страница 8: ... switch as well as positive and negative connectors immediately Failing to do so may cause device damage which is not covered under any warranty Wait until the night when solar irradiance declines and the PV string current drops to below 0 5 A Then set the DC switch to the OFF position remove the positive and negative connectors and correct the polarities of the DC input power cable 1 Assemble DC ...

Страница 9: ...munication is used install a WLAN FE Smart Dongle SDongleA 05 If 4G communication is used install a 4G Smart Dongle SDongleA 03 You need to purchase the Smart Dongle by yourself WLAN FE Smart Dongle FE Communication You are advised to use a CAT 5E outdoor shielded network cable outer diameter 9 mm internal resistance 1 5 Ω 10 m and shielded RJ45 connectors GPRS 4G WLAN FE ...

Страница 10: ...e Smart Dongle ensure that the buckle springs back in place you can hear a click 4G Smart Dongle 4G Communication For details about how to operate the WLAN FE Smart Dongle SDongleA 05 see SDongleA 05 Quick Guide WLAN FE For details about how to operate the 4G Smart Dongle SDongleA 03 see SDongleA 03 Quick Guide 4G The quick guide is delivered with the Smart Dongle You can download them by scanning...

Страница 11: ...ails see the user manual 9 485B2 RS485 differentia l signal 10 DIN2 11 N A N A N A 12 DIN3 13 GND GND Used to connect to the rapid shutdown DI signal port or served as a reserved port for the signal cable of the NS protection 14 DIN4 15 DIN5 Rapid shutdown signal 16 GND Optional Installing the Signal Cable 3 6 Not all inverter models are delivered with the signal cable connector When laying out th...

Страница 12: ... for export limitation Select the Smart Power Sensor according to the actual project To ensure the system response speed the Smart Power Sensor is recommended to be connected to a COM port separately from inverter COM port Smart Dongle Networking Scenario In the Smart Dongle networking scenario the SmartLogger cannot be connected The Smart Power Sensor is necessary for export limitation Only the D...

Страница 13: ...nnect the signal cable to the signal cable connector Optional Installing the RS485 Communications Cable Inverter Cascading 2 Connect the signal cable connector to the communication port Communications port COM ...

Страница 14: ...13 Optional Installing the Smart Power Sensor Signal Cable 1 Connect the signal cable to the signal cable connector 2 Connect the signal cable connector to the communication port Communications port COM ...

Страница 15: ...Connect the signal cable to the signal cable connector Optional Installing the Grid Scheduling Dry Contact Signal Cable 2 Connect the signal cable connector to the Communication port Communications port COM ...

Страница 16: ...connected correctly securely and reliably 8 Unused terminals and ports are locked by watertight caps 9 The installation space is proper and the installation environment is clean and tidy 4 Verifying Installation 1 Turn on the AC switch between the inverter and the power grid 2 Optional Remove the screw for locking the DC switch 3 If there is a DC switch between the PV string and the inverter turn ...

Страница 17: ... the AC is on Off Off Both the DC and AC are off Blinking red at short intervals N A There is a DC environmental alarm such as an alarm indicating that High String Input Voltage String Reverse Connection or Low Insulation Resistance N A Blinking red at short intervals There is an AC environmental alarm such as an alarm indicating Grid Undervoltage Grid Overvoltage Grid Overfrequency or Grid Underf...

Страница 18: ...ort intervals on for 0 2s and then off for 0 2s The inverter is communicating with the management system through the Dongle WLAN FE Smart Dongle LED LED Description Color Status Yellow blinking green and red simultaneously Steady on The Dongle is secured and powered on Green Blinking in a 2 second cycle on for 0 1s and then off for 1 9s Dialing duration 1 min Green Blinking at long intervals on fo...

Страница 19: ... screens prevail Obtain the initial password for connecting to the solar inverter WLAN from the label on the side of the solar inverter To ensure account security change the password periodically and keep the new password in mind Not changing the password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot ...

Страница 20: ...aller accounts for a company log in to the FusionSolar app and tap New User to create an installer account Creating a PV Plant and a Plant Owner 6 3 For details see the FusionSolar App Quick Guide You can scan the QR code to download the app ...

Страница 21: ...g points in the corners are in the frame Ensure that each QR code is attached within the frame For details about the physical layout of Smart PV Optimizers see FusionSolar App Quick Guide Setting the Physical Layout of Smart PV Optimizers 6 4 Scenario 1 Setting on the FusionSolar Server Side Solar Inverter Connected to the Management System 1 Tap the plant name on the Home screen to access the pla...

Страница 22: ...e following methods to perform operations as prompted Method 1 Tap Identify image and upload the physical layout template photo to complete the optimizer layout The optimizers that fail to be identified need to be manually bound Method 2 Tap Add PV modules to manually add PV modules and bind the optimizers to the PV modules 1 If the solar inverter is not connected to the FusionSolar Smart PV Manag...

Страница 23: ...connected to the Internet Device commissioning is not displayed after you tap 7 FAQ SmartLogger1000A SmartLogger3000 For details see the Distributed PV Plants Connecting to Huawei Hosting Cloud Quick Guide Distributed Solar Inverters SmartLogger1000A RS485 Networking and PV Plants Connecting to Huawei Hosting Cloud Quick Guide Inverters SmartLogger3000 RS485 Networking You can scan the QR codes to...

Страница 24: ...ch and set the DC switch to ON Ensure that the indicator is blinking green at long intervals c Turn off the AC switch and set the DC switch to OFF Wait until all LED indicators on the SUN2000 panel are off d Turn on the AC switch and set the DC switch to ON a Wait until the indicator blinks green at long intervals b Obtain the initial WLAN hotspot name SSID and initial password PSW from the label ...

Страница 25: ...0060 3 21686868 Japan Japan Japan_ESC ms huawei com 0120258367 India India indiaenterprise_TAC huawei com 1800 103 8009 South Korea South Korea Japan_ESC ms huawei com N A North America USA na_inverter_support huawei com 1 877 948 2934 Canada na_inverter_support huawei com 1 855 482 9343 Latin America Mexico la_inverter_support huawei com 018007703456 0052 442 4288288 Argentina 0 8009993456 Brazil...