![Huawei Quidway S9300 Скачать руководство пользователя страница 302](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487302.webp)
6.23.2 Creating an NQA MTrace Test
6.23.3 Configuring the NQA MTrace Test
6.23.4 (Optional) Adjusting the Performance of the NQA MTrace Test
6.23.5 Starting the NQA MTrace Test
6.23.6 Setting Policies for Filtering Queriers
6.23.7 Checking the Configuration
6.23.1 Establishing the Configuration Task
Before configuring an MTrace test for the RPF path from the multicast source to the destination
host, familiarize yourself with the applicable environment, complete the pre-configuration tasks,
and obtain the required data. This can help you complete the configuration task quickly and
accurately.
Applicable Environment
To check the RPF path from the multicast source to the destination host, you can perform the
NQA MTrace test.
By performing this test, you can obtain the possible transmission path of multicast packets.
During the test, actual multicast data flows are not required.
The MTrace test can be used in multicast troubleshooting and routine maintenance to locate the
faulty nodes and reduce configuration errors.
Pre-configuration Tasks
Before configuring the MTrace test, you must enable the multicast function in the network.
Data Preparation
To configure the MTrace test, you need the following data.
6 NQA Configuration
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6-82
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 03 (2010-09-20)