7
The following section takes the installation of the VIS6000 ( two FC port m four GE port modules)
in the N610E-22 cabinet as an example.
Installation Procedure
Start
Take antistatic measures
Install the VIS6000 in the cabinet
Install the VIS6000 in the cabinet
Connect the grounding cable
Connect the storage array and application server to the VIS6000
Connect the production center to the disaster recovery center
Connect the VIS6000 to the maintenance terminal
Connect power cable
Power on the devices
End