background image

13 

After the storage system is powered on, do the following to initialize it. 
1. Modify the IP address of the management network port through CLI (before this operation, you need to 

connect the serial port on the controller enclosure to a maintenance terminal). 

2. Install the ISM (on the maintenance terminal). 
3. Modify the password of the administrator. 

After the storage system is initialized, you are recommended to install the following host software on the 
application server. 

     UltraPath: for how to install the UltraPath, see the 

OceanStor UltraPath for Windows User Guide

OceanStor 

UltraPath for Linux User Guide

, and 

OceanStor UltraPath for AIX User Guide

The initial value for the IP address of the management network port is 192.168.128.101 or  

   192.168.128.102. The default subnet mask is 255.255.255.0. 

The default name of the storage system is "admin", and the password is "Admin@storage". You are  

   advised to change the default login password immediately after you have logged in to the storage  
   system for the first time, and to periodically change your login password in the future. This reduces  
   the password leakage risks. 

For details on how to initialize the storage system, see the 

OceanStor Dorado2100 Storage System  

   Installation Guide

.  

 

If faults occur during power-on, seek help from the 

OceanStor Dorado2100 G2 Storage System Troubleshooting

 For questions about technical support and service, contact your service provider. 

 For questions about upgrades, contact your local sales office. 

Installing Front Panels 

Initializing the Storage System 

Installing Host Software 

How to Obtain Help 

HUAWEI TECHNOLOGIES CO., LTD. 

Huawei Industrial Base Bantian Longgang Shenzhen 

518129 

People’s Republic of China 

enterprise.huawei.com 

 

Obtain the documentation for the UltraPath from the delivery-attached CD-ROM.  

Installing the front panel for the 2 U device 

After checking that the storage system is powered on normally, install front panels for a neat appearance. 
 

Содержание OceanStor Dorado2100 G2

Страница 1: ... during power on To avoid device damage ensure that the devices are properly grounded before power on Copyright Huawei Technologies Co Ltd 2012 All rights reserved Safety Information To avoid personal injuries it is recommended to carry one fully configured controller enclosure or disk enclosure by three persons Before handling devices wear ESD clothes ESD gloves or ESD wrist strap and take off co...

Страница 2: ...ctric current of the circuit breakers of the external power supplies to which the storage device is connected complies with the following specifications Controller enclosure 2 U Adjustable guide rails Front panel 2 U Multi mode optical fiber Network cable The above table only includes part of the materials to be used during the installation For information about all the materials see the Packing L...

Страница 3: ...culated through the following formula 2 U 2 U x number of 2 U disk enclosures Figure 1 Figure 2 If the planned device installation positions are occupied by filler panels remove them in the method shown in Figure 1 After removing the filler panels remove floating nuts in the method shown in Figure 2 If the floating nut mounting bar is unavailable you can use a flat head screwdriver instead When us...

Страница 4: ... adjustable guide rails are initially equipped with positioning pins applicable to square installation holes only For round installation holes replace the positioning pins After the left adjustable guide rail is installed install the right adjustable guide rail in the same method To avoid device damage do not directly pile up the devices but install the devices onto the guide rails 6 Installing th...

Страница 5: ... required floating nuts are installed at the installation holes of the M6 fixing screws 8 Installing Filler Panels If you do not have a floating nut mounting bar you can use a flat head screwdriver instead When using a flat head screwdriver to install the floating nuts handle it gently otherwise the flat head screwdriver may skid and injure the hands or storage devices ...

Страница 6: ...e general view of cable connecting ports using the AC controller enclosure configured with 10 Gb TOE host ports as an example After connecting one end of the ground cable to the ground terminal of the storage device connect the other end of the ground cable to the ground terminal of the cabinet in the same method ...

Страница 7: ...n port on the controller enclosure can be connected to a maximum of three disk enclosures each of which supports up to 25 disks The bend radius of the mini SAS cable should be larger than 150 mm 5 91 inches If the controller enclosure is connected to one or two disk enclosures Expansion module on controller A must connect to expansion module A on each disk enclosure Expansion module on controller ...

Страница 8: ...rt on the maintenance terminal using a network cable so that the maintenance terminal can manage and maintain the storage device For details about each port and the cable connected to it see the OceanStor Dorado2100 G2 Storage System Installation Guide After connecting the serial port to the maintenance terminal using a serial cable you can manage and maintain the storage system through the serial...

Страница 9: ...nnecting AC power cables Complete view of the connected AC power cables The AC device is allowed to connect to AC power supplies only and the DC device is allowed to connect to DC power supplies only The AC power modules and DC power modules of the storage system can connect to two routes of power supplies To ensure the high availability of the storage system and avoid unexpected power down of the...

Страница 10: ...t it connects IB cable The IB cable is fully inserted into the IB host port The IB cable is loose in the IB host port Network cable The network cable is fully inserted into the management network port The network cable is loose in the management network port AC power cable The AC power cables for each controller enclosure or disk enclosure are connected to two separate power sources redundantly Th...

Страница 11: ...e status indicators after the devices are powered on When the storage system is powered on the colors of the indicators vary with the port speeds For details see the OceanStor Dorado2100 G2 Storage System Installation Guide 2 Pressing the Power Button on Controller Enclosure Power indicator of the controller enclosure Green on Green on Disk running indicator Each controller enclosure has a hot spa...

Страница 12: ...reen on Green on Blue on Link Speed indicator of the 8 Gb FC host port Blue on Green on Link indicator of the mini SAS expansion port Blue on Link Speed indicator of the 10 Gb TOE host port Running indicator of the interface module Power running alarm indicator Green on Fan running alarm indicator Power indicator of the expansion module Green on Link indicator of the PRI expansion port Green on Bl...

Страница 13: ...min storage You are advised to change the default login password immediately after you have logged in to the storage system for the first time and to periodically change your login password in the future This reduces the password leakage risks For details on how to initialize the storage system see the OceanStor Dorado2100 Storage System Installation Guide If faults occur during power on seek help...

Отзывы: