2. Weld off the entrance elbow below the filter dryer.
3. Weld off the filter dryer assembly include filter dryer and entrance elbow
from the above of the filter dryer.
4. Weld off the entrance elbow from the filter dryer assembly and take out the
filter dryer.
Step 5 Install the new filter dryer, as shown in
.
NO TICE
● Weld the entrance elbow and the new filter dryer to form an assembly, and
then weld the assembly to the original position. Note that the arrow direction
on the filter dryer identifies the flow direction of the refrigerant.
● Do not use face-down bonding.
Figure 4-29 Installing the filter dryer
1. Remove the rubber plug sealing the port of the new filter dryer.
2. Weld the removed entrance elbow and the new filter dryer to form a new
assembly.
3. Weld the assembly to the original position.
4. Secure the hold hoop in reverse order of removing it.
Step 6 Reinstall the liquid pipe NTC temperature sensor.
Step 7 Perform a leakage test with nitrogen again.
Step 8 After checking that the smart cooling product does not leak, vacuumize the smart
cooling product and charge refrigerant.
----End
4.2.2.10 (Optional) Replacing the Liquid Level Detector
Prerequisites
●
The liquid level detector needs to be replaced.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
4 Parts Replacement
Issue 01 (2021-04-20)