![Huawei FusionDC1000A Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/huawei/fusiondc1000a/fusiondc1000a_maintenance-manual_168032069.webp)
Step 5 Remove the front and rear sealing plates from the smart cooling product base.
Figure 4-4 Removing sealing plates from the smart cooling product base
Step 6 Reinstall the removed ESD floors.
NO TICE
● The ventilation floor panel of the hot aisle can be reinstalled after the water
refill and drainage pipes of the smart cooling product are removed.
● Adjust the height of the floor tray to ensure that the reinstalled floor panels are
flush with other floor panels.
Step 7 Remove fasteners at the top and bottom of the smart cooling product.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
4 Parts Replacement
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
61