background image

Hook

Hook

CloudEngine 16816
mounting hole 1

CloudEngine 16816
mounting hole 2

CloudEngine 16816
mounting hole 3

CloudEngine 16816
mounting hole 4

CloudEngine 16816
mounting hole 10

CloudEngine 16816
mounting hole 11

CloudEngine 16816
mounting hole 12

CloudEngine 16816
mounting hole 13

Part 1

Part 1

6.3 Install the Chassis in the Cabinet/Rack

Tighten the captive screws on mounting brackets.

1

3

6

If MPUs, LPUs, SFUs, power modules, and fan modules have been installed on the switch, you are advised to remove them before installing the switch in the cabinet/rack.    

If a power distribution box needs to be installed in the same cabinet/rack as the switch, install the switch first, and then the power distribution box.

Do not impose loads on the interior bottom (if any) of the cabinet/rack during the installation. 

Protect your personal safety when dragging the metal handles at the rear of chassis.

5

2

4

Installing the Chassis

6

6.1 Install Floating Nuts and Guide Rails

When marking the positions of floating nuts and guide rails, keep the bottom edge of the installation 

template on the first scale tick counted from the bottom. 

Positions of mounting brackets only need to be marked on the front mounting rails, whereas positions of 

expandable guide rails must be marked on both the front and rear mounting rails. Keep the mounting holes 

on the front and rear mounting rails on the same horizontal plane.

(Two persons) Align mounting holes on the installation template with mounting holes on the mounting rails,

and fix the installation template on the mounting rails. Mark positions of the mounting brackets and

expandable guide rails. Then remove the installation template.

Install floating nuts in the marked mounting holes.

1

2

3

Power Distribution Requirements

5

If CloudEngine 16800 series switches use AC or high-voltage DC power supply, the PDU installed in the cabinet must provide at least 

16 A of rated output current on each line. Replace the PDU if this requirement cannot be met. 

If CloudEngine 16800 series switches use DC power supply, the power supply device must provide at least 58.5 A of rated output 

current on each line. Replace the power supply device if this requirement cannot be met. 

CloudEngine 16800 series switches must be reliably grounded. Circuit breakers with the current leakage protection function are not 

recommended for the switches.

Cabinet Requirements

4

The Huawei A812 cabinet is recommended. To support the chassis in the cabinet/rack, you can use Huawei expandable guide rails 

(expandable between 500 mm and 850 mm) or separately purchased guide rails or tray with sufficient load bearing capacity. 

A 800 mm wide and 1200 mm deep cabinet/rack is recommended. It is recommended that the distance (distance A in the figure) between 

front mounting tails and the outer side of the front door is in the range from 165 mm to 175 mm, and the distance (distance B in the figure) 

between front and rear mounting rails is in the range from 650 mm to 750 mm.

The cabinet or rack to be adopted must have enough vertical space for device installation:

CloudEngine 16816 DC chassis: ≥ 37U

CloudEngine 16816 AC & high-voltage DC chassis: ≥ 35U

For chassis heat dissipation and convenient maintenance, leave at least 1000 mm of clearance at the front and rear of the switch. Do not 

install the switch against a wall.

If the switch is installed in a 600 mm wide cabinet/rack, do not install a PDU directly facing the switch. Otherwise, the installation and 

removal of fan modules are affected. When installing a PDU, ensure that the PDU and the switch are installed at different heights in the 

cabinet/rack.

The cabinet must have reliable ground terminals for equipment grounding. 

Cables must be routed out symmetrically from the left and right sides of the cabinet. An 800 mm wide cabinet can provide sufficient 

spacing for cabling. 

If you use AC power modules and AC power cables delivered from Huawei, ensure that an AC power source is available within 3 m 

(cable distance) away from the power distribution unit (PDU) of the switch. If you use DC power modules, determine the distance from 

the power distribution cabinet to the PDU of the switch (cable distance) according to site survey results. DC cables delivered from 

Huawei are 20 m long by default. 

The cabinet must have sufficient load bearing capacity to support all the devices in it. The minimum load bearing capacity for a single 

chassis is 859 kg. 

The cabinet must meet the requirements for front-to-back airflow, and the front and rear doors must have a porosity rate of more than 

55%. 

If necessary, use an earthquake-proof cabinet complying with GR63 Zone4 or Zone3 standard.

The following factors must also be taken into account when you select a cabinet:

Site Requirements

3

The equipment must be installed in a clean, dry, and well ventilated standard 

equipment room where temperature can be controlled within a proper range. The 

equipment room must be free from leaking or dripping water, heavy dew, and 

humidity.      

Take dustproof measures in the equipment room. Dust will cause electrostatic 

charges on the chassis and affect connections of metal connectors and joints. This 

shortens equipment service life and may cause failures of the switch. 

The installation site must be free from acidic, alkaline, or other corrosive gases.

The CloudEngine 16816 switch must be used indoors. To ensure normal operations

and long service life of the switch, the installation site must meet the following

requirements:

The temperature and humidity in the installation site must be within allowed

ranges. (See the table below.)

Item

Temperature

Operating relative humidity
Storage relative humidity

Requirement

Operating temperature: 0°C to 40°C (0 m to 1800 m)

When the altitude is between 1800 m and 5000 m,
the highest operating temperature reduces by 1ºC
every time the altitude increases by 220 m.

5% RH to 85% RH, noncondensing

Storage temperature: -40ºC to +70ºC

5% RH to 95% RH, noncondensing

Operating/Storage altitude

≤ 5000 m

Safety Guidelines

2

Observe all safety regulations and precautions

Before installing, operating, or maintaining the equipment, 

wear an ESD wrist strap and insert the other end into the ESD 

jack on the chassis or cabinet. Remove conductive objects like 

jewelry and watches to prevent damages to the equipment 

and cards caused by electrostatic discharge.

ESD protection

Only trained and qualified personnel are allowed to install, operate or maintain the 

equipment. Familiarize yourself with all safety precautions before performing any 

operation on the equipment.

Operator qualifications

During equipment transport and installation, prevent the equipment from 

colliding with objects like doors, walls, or shelves. 

Move an unpacked chassis upright. Do not drag it with it lying down. 

Do not touch unpainted surfaces of the equipment with wet or contaminated 

gloves. 

Do not open the ESD bags of cards and modules until they are delivered to the 

equipment room. When taking a card out of the ESD bag, do not use the 

connector to support the card's weight because this operation will distort the 

connector and make the pins on the backplane connector bend. 

Do not install or remove the equipment or power cables while power is on. 

To ensure equipment and personal safety, ground the equipment before powering 

it on.

To ensure personal and equipment safety, observe all the safety precautions on the 

equipment and in this document.                                                  and            

items do not cover all the safety precautions and are only supplementary to the 

safety precautions. 

Follow all the safety precautions and instructions provided by Huawei. The safety 

precautions outlined in this document are only requirements of Huawei and do not 

cover general safety regulations. Huawei is not liable for any consequence that 

results from violation of regulations pertaining to safe operations or safety codes 

pertaining to design, production, and equipment use.

Use multiple persons to move or lift a chassis and take measures to protect 

personal safety. 

Laser beams will cause eye damage. Do not look into bores of optical modules or 

optical fibers without eye protection.

Device Overview

1

This document provides a brief installation guide to help you install the CloudEngine 16816 switch 

quickly. For more information, see the                                                                      . 

Figures in this document are for reference only and may be different from actual devices.

Accessories

Item
Height

Weight with MPUs and filler 

panels (base configuration)

Weight with 36x100GE LPUs 

and SFUs of G series 

(full configuration)

Power parameters

CloudEngine 16816

Rated input voltage(DC): -48V DC/-60V 
Input voltage range(DC): -40V DC to -72V

Rated input voltage(AC): 220 V, 50 Hz/60 Hz 
Input voltage range(AC): 176 V to 290 V, 45 Hz to 65 Hz

Rated input voltage(HVDC): 240V/380V 
Input voltage range(HVDC): 188 V to 288 V/260 V to 400 V

Width x Depth (chassis 

dimensions, excluding cable 

management frames and 

mounting brackets)

Width x Depth (max. 

dimensions, including cable 

management frames and 

mounting brackets)

1436 mm (32.3U)

442 mm x 1033 mm
(17.40 in. x 40.67 in. )

483 mm x 1144 mm
(19.02 in. x 45.04 in.)

AC&HVDC: 262.8 kg (579.47 lb)
DC: 273.8 kg (603.73 lb)

AC&HVDC: 569.6 kg (1255.97 lb)

DC: 572.6 kg (1262.58 lb)

(Note: This quick installation guide is also the 

Installation Template.

)

CloudEngine 16816 Switch

Quick Installation Guide

Issue: 06

Part Number: 31500BEX

Protect your personal safety when moving the flat cart and pallet. Do not stand in front of the flat cart when it is moving.

18 floating nuts are used to secure the mounting brackets, and 10 floating nuts are used to secure the guide rails 

(two for the front end and three for the rear end of each guide rail).

Remove the bolts that fix the chassis.

Place the flat cart at the rear of the chassis and secure it to the pallet. Step on the brakes of all the casters of the flat cart. One person pulls the metal handles at the rear of the chassis to pull the chassis and 

adjust the chassis direction, and at least two persons push the chassis horizontally in the front of the chassis, until the chassis cannot move forward.
Loosen the bolts on the flat cart, and then secure the bolts to fix the chassis.
Push the flat cart with the chassis to the front of the cabinet/rack (with the rear of the chassis facing the cabinet/rack). Remove the screws and bolts that fix the chassis on the flat cart.

Align bottom edges at two sides of the chassis with the guide rails and place the chassis onto the guide rails. One person holds the metal handles at the rear of the chassis to drag the chassis and keep the chassis 

in the correct direction. At least two persons stand in the front of the cabinet/rack to push the chassis along the guide rails, until the mounting brackets on the chassis are completely attached to the mounting 

rails.

Secure the guide rails to the marked positions in the cabinet/rack. Install the guide rails as follows:

a. Adjust the length of the guide rails and place them in marked positions on the mounting rails by the 

plate at the front end and hook at the rear end. The bottom edges of the guide rails must be aligned with 

scale lines on the mounting rails. Then secure the guide rails with 

M6

 screws. 

b. Use 

M6

 screws to secure the air baffle to the guide rails, tighten the M6 screws with a torque of 1.96 

N·m. 

B

1200 mm

800 mm

A

Front 

cabinet door

Remove all mo

dules to redu

ce chassis

weight before

 moving or lif

ting the chas

sis.

建议搬抬

前取出所有模

块,以减

轻机箱

重量。

CAUTION

55kg (121

 lbs)

Remove all mo

dules to redu

ce chassis

weight before 

moving or lift

ing the chass

is.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (12

1 lbs)

SWITCH1

   OPEN 

  SWITCH

2

CloudEng

ine16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

(Note: This quick installation guide is also the 

Installation Template.)

CloudEngine 16816 Switch

Quick Installation Guide

Issue: 06

Part Number: 31500BEX

2

F/R

3

(x2)

(x3)

M6

a

3

b

M6

MARK

1

  Install floating nuts

(Optional) 6.2 Adjusting the Second Half of the Mounting Bracket

When installing the CloudEngine 16816, reserve sufficient space on the top of the CloudEngine 16816 for 

power cable routing.

CloudEngine 16816 DC chassis: reserved space ≥ 3U

CloudEngine 16816 AC & high-voltage DC chassis: reserved space ≥ 1U

Remove all m

odules to red

uce chassis

weight before

 moving or lif

ting the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

Remove all m

odules to red

uce chassis

weight befor

e moving or l

ifting the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

SWITCH1

   OPEN   SW

ITCH2

CloudEngine16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

PWR

FAN

SFU

MPU

CloudEngine 12800

SWITCH1   OPEN   SWIT

CH2

CloudEngine16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

6

5

Remove all m

odules to redu

ce chassis

weight before

 moving or li

fting the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

Remove all m

odules to red

uce chassis

weight before

 moving or li

fting the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

SWITCH1

   OPEN   S

WITCH2

CloudEngin

e16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

Remove all m

odules to redu

ce chassis

weight before

 moving or li

fting the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

Remove all m

odules to red

uce chassis

weight before

 moving or lif

ting the chas

sis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

SWITCH1

   OPEN   SW

ITCH2

CloudEng

ine16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

1

2

Remove all m

odules to red

uce chassis

weight before

 moving or lif

ting the chas

sis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121

 lbs)

Remove all modu

les to reduce

 chassis

weight before 

moving or lift

ing the cha

ssis.

建议搬抬前

取出所有模

块,以减轻

机箱

重量。

CAUTION

55kg (121 

lbs)

SWITCH1   OPEN   SWIT

CH2

CloudEngine

16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

4

CloudEngin

e16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

3

2

Remove all mo

dules to red

uce chassis

weight before

 moving or lif

ting the chas

sis.

建议搬抬前取

出所有模块,以减

轻机箱

重量。

CAUTION

55kg (121

 lbs)

Remove al

l modules to r

educe chass

is

weight be

fore moving or l

ifting the cha

ssis.

建议搬

抬前取出所有

模块,以

减轻机箱

重量。

CAUTION

55kg (121 lb

s)

SWITCH1

   OPEN 

  SWITCH2

CloudEngine16800

FAN

SFU

LPU

MPU

PWR

FRONT

REAR

First half of the 

mounting bracket

Second half of the 

mounting bracket

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

1

1

2

3

4

5

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

2

1

2

3

4

5

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

Remove all modules to reduce chassis

weight before moving or lifting the chassis.

建议搬抬前取出所有模块,以减轻机箱
重量。

CAUTION

55kg (121 lbs)

3

1

2

3

4

5

Hardware Installation and Maintenance Guide

Expandable guide rail
Quick Installation Guide
Floating nut mounting
bar
Serial cable
Fiber binding tape
Bare crimp terminal
Heat shrink tube
AC power cable
Signal cable label
Power cable label

ESD wrist strap
Cable tie
Tweezers (for inserting and

removing optical fibers)

SFU wrench
Cable management frame
Panel screw
Floating nut and 
matching screw
SFU wrench storage box

Measure the distance (A) between the front mounting rail and the outer side of the front door, and adjust the 

mounting brackets to proper positions according to the mapping between distance A and mounting bracket 

installation positions (The first half of the mounting bracket is connected to a cable management frame and 

cannot be adjusted).

Distance A
1000mm deep cabinet
150mm
165mm
175mm(recommended)

165mm~175mm
180mm~190mm
190mm~200mm

Default position (callout 1 in the figure)
Position shown in callout 2 in the figure
Position shown in callout 3 in the figure

1100mm to 1200mm deep cabinet

Mounting Bracket Installation Position
-

The first half of the mounting bracket does not need to be adjusted. Therefore, do not uninstall any screw 

used to fix the first half.

Отзывы: