Figure 3-10
Closing the housing and tightening the screws
Step 18
Take off the ESD wrist strap or ESD gloves, and pack up all tools.
----End
Follow-up Procedure
l
Put the replaced component into an ESD box or bag. Then, put the ESD box or bag into a
carton padded with foam or into the packing box of the new board.
l
Fill in the fault form with the detail information of the replaced board.
l
Contact the local Huawei office to handle the faulty component.
BTS3902E WCDMA
Site Maintenance Guide
3 Replacing the BTS3902E
Issue 06 (2014-05-16)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15