Item
Silkscreen
Description
DBG
There are two ports:
l
Network port, used for local
commissioning on the LMT
l
USB port
**
, used for local commissioning
with a USB flash drive and for clock
testing
Indicators
RUN
ALM
ACT
VSWR
O/E
O
NOTE
l
*: The ETH port and OPT1 port cannot be used simultaneously.
l
**: The security of the USB port is ensured by encryption. The USB port is used for commissioning
the base station rather than importing or exporting the base station configuration.
2.3 BTS3902E Indicators
A BTS3902E has six indicators, which indicate the running status of the BTS3902E.
For details about the indicator positions on the BTS3902E panel, see
.
describes BTS3902E indicators.
Table 2-3
BTS3902E indicators
Indicator
Color
Status
Description
RUN
Green
Steady on
There is power supply, but the BTS3902E is
faulty.
Off
There is no power supply, or the BTS3902E
is faulty.
Blinking (on for
1s and off for 1s)
The BTS3902E is working properly.
Blinking (on for
0.125s and off for
0.125s)
Software is being loaded to the BTS3902E,
or the BTS3902E is not started.
BTS3902E WCDMA
Hardware Description
2 BTS3902E Overview
Issue 09 (2014-05-16)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10