ACBox2000-21-D-A
User Manual (Pan-Europe Edition)
5 Electrical Connections
Issue 01 (2016-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
38
Figure 5-19
Reinstalling safety warning panels and insulation partitions
----End
Follow-up Procedure
Check that the cables are connected correctly and securely, and then seal the waterproof
connectors with firestop putty.
If cables need to be routed underground, reserve a margin of 0.5 meter for the AC power
cable connecting to the ACBox2000 to avoid stress.
5.8 Closing the Chassis Door
Procedure
Step 1
Install the cover.