ACBox2000-21-D-A
User Manual (Pan-Europe Edition)
4 Installation
Issue 01 (2016-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10
4
Installation
4.1 Checking Before Installation
Checking the Outer Packing
Before unpacking the ACBox2000, examine the outer packing for damage such as holes and
cracks. If any such damage is found, do not unpack the ACBox2000 and contact the dealer
immediately.
Remove the outer packing only 24 hours before installing the ACBox2000.
Checking the Product and Accessories
After unpacking the ACBox2000, check the product and accessories. If any damage is found
or any component is missing, contact the dealer.
For the number of items included in the delivery, see the
Packing List
in the packing case.
4.2 Tools
Tool
Model
Function
Hammer drill
Drill bit: Φ14 mm, Φ16
mm
Drill bit: Φ14 mm, used for
drilling holes in supports
Drill bit: Φ16 mm, used for
drilling holes in walls