45
LP-387 REV. 12.15.14
Figure 21
– Unbalanced Flue/Vertical Vent - NOTE: Drawing is meant to demonstrate system venting ONLY.
All vent pipes must be glued, properly supported, and the exhaust must be pitc
hed a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.
An unbalanced vent system can be installed ONLY when the exhaust is installed in a vertical position.
Содержание EFT-110
Страница 14: ...14 LP 387 REV 12 15 14 SPECIFICATIONS AND DIMENSIONS Figure 2 LP 387 K ...
Страница 24: ...24 LP 387 REV 12 15 14 Figure 8 Piping Symbol Legend ...
Страница 58: ...58 LP 387 REV 12 15 14 Figure 32 Cascade Master and Follower Wiring ...
Страница 59: ...59 LP 387 REV 12 15 14 Figure 33 Internal Connection Diagram LP 293 J ...
Страница 82: ...82 LP 387 REV 12 15 14 EFT 55 80 110 PARTS BREAKDOWN Figure 36 Replacement Parts LP 387 J ...
Страница 84: ...84 LP 387 REV 12 15 14 EFT 155 199 285 399 PARTS BREAKDOWN Figure 38 Replacement Parts LP 387 KK ...
Страница 88: ...88 LP 387 REV 12 15 14 ...
Страница 89: ...89 LP 387 REV 12 15 14 ...
Страница 90: ...90 LP 387 REV 12 15 14 MAINTENANCE NOTES ...