38
LP- 446 REV. 9.3.14
Figure 19
– Horizontal Venting - NOTE: Drawing is meant to demonstrate system venting ONLY.
NOTES:
A. For every 1” of overhang, the exhaust vent must be located 1” vertical below overhang (overhang means top of building structure
and not two adjacent walls [corner of building]).
B. Typical installations require 12” minimum separation between bottom of exhaust outlet and top of air intake.
C. Maintain 12” minimum clearance above highest anticipated snow level or grade (whichever is greater).
D. Minimum 12” between vents when installing multiple vents.
E. 12” minimum beyond air intake.
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the appliance to
allow drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the appliance and
the balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from
the boiler.
Содержание 500 HL
Страница 12: ...12 LP 446 REV 9 3 14 Figure 2 Dimensions and Specifications ...
Страница 21: ...21 LP 446 REV 9 3 14 H PIPING DIAGRAMS Figure 6 ...
Страница 44: ...44 LP 446 REV 9 3 14 E GAS VALVE Figure 26 Mod Con 500 Gas Valve ...
Страница 52: ...52 LP 446 REV 9 3 14 Figure 33 Mod Con Internal Connection Diagram LP 428 K ...
Страница 71: ...71 LP 446 REV 9 3 14 Figure 36 ...
Страница 72: ...72 LP 446 REV 9 3 14 Figure 37 ...
Страница 73: ...73 LP 446 REV 9 3 14 Figure 38 ...
Страница 74: ...74 LP 446 REV 9 3 14 Figure 39 ...
Страница 77: ...77 LP 446 REV 9 3 14 ...
Страница 78: ...78 LP 446 REV 9 3 14 ...
Страница 79: ...79 LP 446 REV 9 3 14 MAINTENANCE NOTES ...