J10
105mm
Страница 1: ...J10 105mm ...
Страница 2: ...e operated with caution and common sense and requires some basic mechanical ability Failure to opera te this Product in a safe and responsible manner could result in injury or damage to the product or other property This product is not intended for use by children without direct adult supervision Do not use with incompatible components or alter this product in any way outside of the instructions p...
Страница 3: ...ation Accessories Troubleshooting Box Contents 01 Landing Gear System 02 03 05 06 Control Horn and Servo Arm Settings 07 Rudder Surface Parameters 07 Clevis Installation 07 Control Surface Centering 07 Control Direction Test 08 09 09 10 11 12 Model Flying Precautions 13 Pre flight Checks 13 ...
Страница 4: ...mm Brushless Outrunner Motor 4253 1200KV 6S 4253 1100KV 8s Required to Complete ATTENTION EDF jets require Li PO batteries with a high discharge rating Crating for increased safety and optimal performance We recommend using Li Po batteries with a minimum of 40C or above For 8S systems that require two batteries in series the C rating must remain the same on both batteries for better consistency an...
Страница 5: ...cal stab LED Fuselage LED Wing LED Landing gear LED Hatch standby port for twice action Hatch port for twice action Hatch port for single action Input 7 5V Pilot lamp Manual operation button Airbrake Elevator Aileron Canard Canard Throw Adjustment Aileron lef Ailer on righ Flap left Flap right Canard Mixed controller ...
Страница 6: ... as shown in the illustration Now install the wing with the spar onto the fuselage wing mounting panels and secure it with the provided wing mounting screws After finishing this procedure install the second main wing as required BALANCE OF CANARD MUST BE CONSISTENT PA3 0 10mm ASSEMBLY Cockpit can be removed by pressing the sides and lifting up towards the front end Install the main wing while ensu...
Страница 7: ...d area as shown in the second figure Apply foam safe adhesive on the exhaust nozzle as shown in the third figure and install 3 Install the ventral fin mounts with the glue as shown omit if pre installed Repeat this step for the other side After the ventral fin mounts are glued install the ventral fins with the provided screws 5 Install the vertical stabilizer into the mounting area at the end of t...
Страница 8: ...dhesive to the inner edges of the nose cone and proceed to install it on the nose of the aircraft 7 Glue the fuel filler pipe onto the right side of the fuselage as shown below After turn over the model and glue the antennas in their respective locations on the fuselage 05 ...
Страница 9: ...o meet the preferences of certain pilots When the fixed landing gears are used the overall all up weight AUW of the aircraft is reduced by the removal of the e retract system The fixed landing gears will also be sturdy enough to take off from grass Assembly of the Fixed Landing Gears 06 ...
Страница 10: ...lerons and or the root of the wing 1 2 3 4 5 6 Clevis Installation After assembly and transmitter setup verify that the control surfaces are 07 The table to the right shows the factory settings for the control horns and servo arms Fly the aircraft at factory settings before making changes After flying you may choose to adjust the linkage positions for the desired control response See the lower tab...
Страница 11: ... in the proper direction Assemble the aircraft and bind your transmitter to the receiver before performing this test Transmitter Command Aircraft Reaction E l e va t o r Up Elevator Command Down Elevator Command A i l e r o n Stick Right Stick Left R u d d e r Stick Right Stick Left Small Big the Throttle the Landing gear 08 According to everyone s operating habit the position of switch can be cho...
Страница 12: ... throttle stick back down to the lowest position 0 You will hear a set of initialization beeps that register the number of cells in the battery Step 5 A final long beep tone will be emitted meaning that the lowest point of the throttle range has been confirmed This means the throttle control has been initialized properly and is ready for use 40mm 25mm 25mm 30mm 30mm 25mm 25mm When experiencing pro...
Страница 13: ...ories HSDA02 01 HSDA02 02 HSDA02 03 HSDA02 04 HSDA02 05 HSDA02 06 HSDA02 07 HSDA02 08 HSDA02 09 HSDA02 16 HSDA02 17 HSDA02 18 HSDA02 19 HSDA02 20 HSDA02 10 HSDA02 11 HSDA02 12 HSDA02 13 HSDA02 14 HSDA02 15 10 ...
Страница 14: ...ccessories HSDA02 21 HSDA02 22 HSDA02 23 HSDA02 24 HSDA02 25 HSDA02 26 HSDA02 27 HSDA02 28 HSDA02 29 HSDA02 38 HSDA02 39 HSDA02 37 HSDA02 30 HSDA02 31 HSDA02 32 HSDA02 33 HSDA02 34 HSDA02 35 HSDA02 36 11 ...
Страница 15: ...nd ESC disconnect two 2 of the three 3 and swap their places for proper response 2 Install a fully charged battery 3 Check for connection ESC and between the 4 Replace motor 5 Consult Radio manual and through bind procedure again go 6 Hold model and move postion then back down to idle throttle to full 1 Both ESC and motor are not establishing a proper response range 1 The servo lead may be connect...
Страница 16: ...les wires and water near by or within close proximity to full size air traffic from trees and buildings and MODEL FLYING PRECAUTIONS PRE FLIGHT CHECKS 1 Always range check your model before any flight especially when flying a new your radio manufacturers guidelines for performing this check model for the first time Follow 2 Check all screw bolts and mounting points are firmly secured including con...
Страница 17: ...J10 105mm Distributed by Banana Hobby California USA Call or Text 626 629 8243 WWW bananaHobby com ...