background image

The ideal isolation base setup is to have the center of gravity of the component in 
the geometric center of the isolation base.  This will result in even loading of the 
isolation feet.  This can be achieved by estimating the center of gravity of your 
component and placing it in the geometric center of the isolation base.  Even 
loading of the isolation feet can also be achieved by moving the component until 
the isolation base is level. 

 
 
 

 

                                                                    Top View 

                                     Component and Isolation Base 

 
 

 
 

If you have a component that does not allow you to locate the center of gravity 
near the geometric center of the isolation base, you can utilize a custom 
combination of isolation feet to accommodate a significant variation in isolator 
loading.  Please consult with your authorized HRS Retailer or HRS directly if you 
have questions regarding proper loading of your M3 Isolation Base. 
 

Содержание M3

Страница 1: ...HARMONIC RESOLUTION SYSTEMS M3 ISOLATION BASE Discover Your System s Capability ...

Страница 2: ...reduces the harmful effects of air borne vibration and structural resonance on your components Please read this manual completely prior to use of your M3 Isolation Base for set up and product care instructions Proper care of you M3 Isolation Base will ensure optimum performance and an aesthetically pleasing appearance Safety Instructions IMPORTANT WARNINGS Do not place any tall objects on the isol...

Страница 3: ...the isolation base part number The isolation base part number is located on the product identification tag fixed to the bottom of the isolation base See the specification section of this manual to determine the rated load range of your isolation base If the M3 Isolation Base is overloaded the custom HRS isolators will bottom and significantly reduce the product performance You can check to see if ...

Страница 4: ...oading of the isolation feet can also be achieved by moving the component until the isolation base is level Top View Component and Isolation Base If you have a component that does not allow you to locate the center of gravity near the geometric center of the isolation base you can utilize a custom combination of isolation feet to accommodate a significant variation in isolator loading Please consu...

Страница 5: ...3 3 x 58 4 x 7 6 62 28 1 1921 19 x 21 x 3 48 3 x 53 3 x 7 6 52 23 5 1719 17 x 19 x 3 43 2 x 48 3 x 7 6 43 19 5 1419 14 x 19 x 3 35 6 x 43 2 x 7 6 37 16 8 M3 Isolation Base Load Range Load Range Supported Equipment Load Range lbs Kg RD Red mark on bottom of isolator 5 25 2 3 11 4 GRN Green mark on bottom of isolator 25 55 13 6 25 0 BL Blue mark on bottom of isolator 55 110 27 2 50 0 Custom Order Up...

Страница 6: ...allic parts of the isolation base feet and frame using a lint free soft non abrasive cloth Use a damp cloth with mild soap if required Do not use abrasive cleaners or solvents to clean the isolation base Abrasive cleaners or cloths of any type may damage the finish of your isolation base Solvents can attack and damage some of the materials in the isolation base and should never be used Do not wash...

Страница 7: ...ial or indirect damages or liabilities resulting from the use of the product covered herein or resulting from any breach of this warranty or any implied warranty relating to said product During this period Harmonic Resolution Systems will repair or replace any defective components free of charge A Return Authorization Number RA Number is required before any product is returned to Harmonic Resoluti...

Страница 8: ...HARMONIC RESOLUTION SYSTEMS INC Great Arrow Industrial Park 255 Great Arrow Ave Suite 39A Buffalo NY 14207 Telephone 716 873 1437 Web www avisolation com E mail info avisolation com ...

Отзывы: