![HPE EDGELINE EL10 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/hpe/edgeline-el10/edgeline-el10_user-manual_2175648009.webp)
Operations
Power up the gateway
If the gateway is connected to a power source, it powers up automatically. It needs to be powered up only
after a manual shutdown.
To power up the gateway, press the Power On/Standby button twice.
Power down the gateway
Before powering down the gateway for any upgrade or maintenance procedures, you must back up
critical gateway data and programs.
Use one of the following methods to power down the gateway:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the gateway enters
standby mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the gateway to power
down.
This method forces the gateway to power down without properly exiting applications and the OS. If an
application stops responding, you can use this method to force a shutdown.
Before proceeding, you must ensure that the gateway is in standby mode by verifying that the system
power LED is off.
Install the antenna
Procedure
1. Power down the gateway
on page 9.
2. Dismount the gateway
on page 12.
3.
Locate the correct slot for installing the antenna.
Operations
9