background image

38.7º C (101.7º F)

Non-operating

Relative humidity (noncondensing)

2

20% to 80%

Operating

5% to 95%

Non-operating

1

All temperature ratings shown are for sea level. An altitude derating of 1° C per 304.8 m (1.8° F per 1000

ft) to 3048 m (10,000 ft) is applicable. No direct sunlight allowed. Upper operating limit is 3,048 m (10,000

ft) or 70 Kpa/10.1 psia. Upper non-operating limit is 9,144 m (30,000 ft) or 30.3 KPa/4.4 psia.

2

Storage maximum humidity of 95% is based on a maximum temperature of 45° C (113° F). Altitude

maximum for storage corresponds to a pressure minimum of 70 KPa.

For more information on the c-Class enclosures, go to

http://www.hpe.com/servers/

bladesystem/enclosures

.

For more site preparation information, go to

http://www.hpe.com/info/Blades-docs

,

select

HPE Integrity BL860c i2 Server Blade

or

HPE Integrity BL860c i4 Server

Blade

in the list of servers, and then select the

Generalized Site Preparation

Guidelines

.

Sample Site Inspection Checklist

Table 3 Customer and Hewlett Packard Enterprise Information

Customer Information

Phone number:

Name:

City or Town:

Street address:

Country

State or province:

Zip or postal code:

Phone number:

Primary customer contact:

Phone number:

Secondary customer contact:

Phone number:

Traffic coordinator:

Hewlett Packard Enterprise information

Order number:

Sales representative

Date:

Representative making survey

Scheduled delivery date

Table 4 Site Inspection Checklist

Comment or
Date

Check either Yes or No. If No, include comment number or date.

Computer Room

No

Yes

Area or condition

Number

Is there a completed floor plan?

1.

Is adequate space available for maintenance needs? Front
36 inches (91.4 cm) minimum and rear 36 inches (91.4
cm) minimum are recommended clearances.

2.

Is access to the site or computer room restricted?

3.

8

Содержание BL860c i2

Страница 1: ...e BL860c i2 BL860c i4 BL870c i2 BL870c i4 BL890c i2 and BL890c i4 Abstract This document contains specific information that is intended for users of this Hewlett Packard Enterprise product Part Number...

Страница 2: ...dard commercial license Links to third party websites take you outside the Hewlett Packard Enterprise website Hewlett Packard Enterprise has no control over and is not responsible for information outs...

Страница 3: ...13 Removing a c7000 device bay divider 14 Removing a c3000 device bay mini divider or device bay divider 15 Installing interconnect modules 16 Interconnect bay numbering and device mapping 16 Installi...

Страница 4: ...enclosures specifically the 10U c7000 and the 6U c3000 Enclosures The nPartition configuration feature is enabled from the factory enabling the BL870c i4 and BL890c i4 to be partitioned into one more...

Страница 5: ...s Figure 1 i2 server blade components Figure 2 i4 server blade components 8 ICH mezzanine connector 1 CPU0 2 CPU0 power connector 9 Mezzanine connector 3 type 1 or 2 10 CPU1 power connector 3 Mezzanin...

Страница 6: ...type 1 or 2 11 CPU1 12 SAS backplane 5 System board thumbscrew 13 Pull tab NOTE The iLO 3 password is located on the pull tab 6 i2 Battery CR2032 i4 System board thumbscrew 7 i2 System board thumbscr...

Страница 7: ...cm 2 025 in Width 48 51 cm 19 1 in Depth Unloaded 8 6 kg 19 lb Weight Fully loaded 11 3 kg 25 lb Table 2 Blade Link dimensions and weight Weight Width Height Blade Link type 5 lb 22 kg 51 mm 2 in 44...

Страница 8: ...rver Blade or HPE Integrity BL860c i4 Server Blade in the list of servers and then select the Generalized Site Preparation Guidelines Sample Site Inspection Checklist Table 3 Customer and Hewlett Pack...

Страница 9: ...e for maintenance 13 Are AC outlets available for servicing needs for example laptop 14 Does the input voltage correspond to equipment specifications 15 Is dual source power used If so identify types...

Страница 10: ...receive 12 volts directly from the enclosure The voltage is immediately passed through an E fuse circuit which will immediately cut power to the blade if a short circuit fault or over current conditio...

Страница 11: ...essential factor of a successful server blade installation and includes the following tasks Gather LAN information Determine the two IP addresses for the iLO 3 MP LAN and the server blade LAN Establis...

Страница 12: ...rrived NOTE To identify each item by part number see the sales order packing slip Returning damaged equipment If the equipment is damaged immediately contact your Hewlett Packard Enterprise customer s...

Страница 13: ...lade 4 Configure iLO 3 MP access 5 Access iLO 3 MP 6 Access UEFI from iLO 3 MP 7 Download latest firmware and update using HP Smart Update Manager 8 Install and boot the OS 9 Installing and powering o...

Страница 14: ...h the device bay shelf back until it stops lift the right side slightly to disengage the two tabs from the divider wall and then rotate the right edge downward clockwise 3 Lift the left side of the de...

Страница 15: ...bay mini divider or device bay divider 1 Slide the locking tab down 2 Remove the mini divider or divider c3000 mini divider Push the divider toward the back of the enclosure until the divider drops o...

Страница 16: ...age the tabs from the wall c Rotate the divider clockwise d Remove the divider from the enclosure Installing interconnect modules For specific steps to install interconnect modules see the documentati...

Страница 17: ...rconnect module in the bay corresponding to the embedded NIC or mezzanine signals Interconnect bay labels c3000 interconnect bay c7000 interconnect bay Server blade signal 1 1 NIC 1 Embedded 1 2 NIC 2...

Страница 18: ...lling the server blade into the enclosure NOTE When installing additional blades into an enclosure additional power supplies might also be needed to meet power requirements For more information see th...

Страница 19: ...r blade power states The server blade has three power states standby power full power and off Install the server blade into the enclosure to achieve the standby power state Server blades are set to po...

Страница 20: ...and programs Use one of the following methods to power off the server blade NOTE To power off blades in a conjoined configuration only power off the Monarch blade Use a virtual power button selection...

Страница 21: ...3 TUI and enter the DF command This dumps the FRU content of the blades NOTE If you will be upgrading an initial installation see the user service guide for more information on server blade upgrades B...

Страница 22: ...A No Bays 1 2 3 4 or 5 6 7 8 c7000 only 4 BL890c i2 and BL890c i4 BL4 with Monarch blade defaulting to slot 1 or slot 5 respectively N A No Bays 1 2 3 4 with Monarch c3000 only 4 BL890c i2 and BL890c...

Страница 23: ...ose CAUTION If not properly aligned you can damage the Blade Link 11 Close the handle when it has engaged 12 Log into iLO 3 on the Monarch blade For more information see the HPE Integrity iLO3 Operati...

Страница 24: ...led and configured however when the conjoined systems ship they come with A B C D stickers located under the Blade Links While auxiliary blades are not slot dependent after being installed and configu...

Страница 25: ...cts provide a mechanism for accessing software updates through the product interface Review your product documentation to identify the recommended software update method To download product updates go...

Страница 26: ...termine whether a repair can be accomplished by CSR For more information about CSR contact your local service provider or go to the CSR website www hpe com support selfrepair Remote support Remote sup...

Страница 27: ...www hpe com support ProLiantServers Warranties HPE Enterprise Servers www hpe com support EnterpriseServers Warranties HPE Storage Products www hpe com support Storage Warranties HPE Networking Produc...

Страница 28: ...cates the year counting from within each new decade with 2000 as the starting point for example 238 2 for 2002 and 38 for the week of September 9 In addition 2010 is indicated by 0 2011 by 1 2012 by 2...

Отзывы: