4/28/2017 860-EI
5.
Installation of Fire Pit
x
Gas supply Line Testing: To prevent damage, unhook fire pit from gas supply during any pressure leak
tests of the gas supply line.
x
IMPORTANT:
Burn Testing- It is the responsibility of the qualified installer to test for gas leaks at all
connections. Perform all leak tests with leak detector or leak reactant.
x
IMPORTANT:
Gas Plumbing Connections: Use only joint compound or tape that is resistant to all
gases. Apply joint compound to all male pipe fittings only-
DO NOT use on flex line flared fittings
.
Be sure to tighten every joint securely.
x
Refer to cut sheets on our website for important dimensional information for your fire pit- visit
hpcfire.com
x
Electronic ignition fire pits come with a sheet of insulation between pan and valve box to protect
internal components from heat damage. This may need to be trimmed on smaller enclosures for proper
fit. Please do not remove insulation.
Installation Steps:
1.
Confirm gas supply to fire pit is OFF.
2.
Connect fire pit to main gas supply using supplied flex line- avoid sharp bends to prevent whistling.
3.
Turn on gas supply, purge gas lines of air and perform leak test on all inlet connections. Repair as needed.
4.
Connect proper 110VAC or 24VAC electrical power following all local codes.
5.
Position fire pit safely with access to all gas connections for testing.
6.
Light fire pit. It may take several cycles to purge air from the lines.
7.
Once fire pit is lit, perform leak test on all gas connections. Repair as needed.
8.
Turn off fire pit and allow cooling.
9.
Apply media as described in Section 6. When filling the pan with lava rock and/or decorative glass, these
instructions must be followed.
10.
Turn on fire pit again and perform leak test with media correctly installed. If gas leak is detected verify
correct media application and repair as needed.
11.
High / Low Models: Attach antenna extension cable as explained on following page.
12.
Set fire pit in properly constructed enclosure (Section 4).
13.
Verify correct operation and lighting.
14.
Review safety manual with end user and instruct not to change/ modify fire pit or media.
15.
Leave manual with end user.
16.
Please apply the Start Up and Shutdown decal next to control box in an obvious position.
Enclosure example of landscape block, brick or stone construction:
Fire Pit Insert
Cap
Enclosure
Vent
Other enclosure material options are metal, concrete, copper, veneer, etc.
Installation
We suggest that our products be installed by professionals
that are locally licensed by the authority having
jurisdiction in gas piping.
Содержание 49X8SSEI-L
Страница 15: ...15 4 28 2017 860 EI...
Страница 16: ...16 4 28 2017 860 EI...
Страница 17: ...17 4 28 2017 860 EI...
Страница 20: ...20 4 28 2017 860 EI...
Страница 21: ...21 4 28 2017 860 EI...
Страница 22: ...22 4 28 2017 860 EI...
Страница 23: ...23 4 28 2017 860 EI...