27
IP Storage Router SR2122-2 User Guide
2
Installation
This chapter describes how to:
■
Prepare your site for installation
■
Prepare and install the SR2122-2 storage router
■
Connect network and Fibre Channel cables
■
Connect power
■
Verify correct installation
For first-time installations, perform the procedures in the following sections in the
order listed here:
■
Site Planning
■
Installing the Storage Router
■
Installing SFP Modules
■
Connecting to Gigabit Ethernet and Fibre Channel Ports
■
Connecting to the 10/100 Ethernet Management and HA Ports
■
Connecting to the Console Port
■
Connecting Power
■
Verifying Installation
■
Where to Go Next
Содержание StorageWorks SR2122
Страница 110: ...Configuring System Parameters 110 IP Storage Router SR2122 2 User Guide ...
Страница 216: ...Cable and Port Pinouts 216 IP Storage Router SR2122 2 User Guide ...
Страница 224: ...Regulatory Compliance Notices 224 IP Storage Router SR2122 2 User Guide ...
Страница 232: ...Recommended Host Storage Configurations 232 IP Storage Router SR2122 2 User Guide ...
Страница 242: ...Index 242 IP Storage Router SR2122 2 User Guide ...