2 Installing the library
This chapter describes the procedures necessary to get your library up and running.
Ensure you have the following equipment and accessories available before installing
the library.
NOTE:
For con
fi
gure-to-order libraries, kits ship with power cables appropriate to the region
instead of US standard power cables.
For a SCSI environment, you need the following:
•
Two Fibre Channel (FC) cables, for the host/switches, for every e2400-160 interface
controller (not included)
•
Four SCSI cables and one Ethernet cable for each e2400-160 Interface Controller
•
Power source (see
the section called “Power and grounding”
for power requirements)
For a native FC environment, you need the following:
•
Four FC drive cables and one Ethernet cable for each e2400-FC 2G or 4G Interface
Controller
•
Two Fibre Channel (FC) cables, for the host/switches, for every e2400-160 interface
controller (not included)
•
Power source (see
the section called “Power and grounding”
for power requirements)
To set up a Cross Linked (CLM) library, ensure that you have the Cross Link Kit and all
of the items identi
fi
ed in the ESL E-Series Upgrade to Cross Link poster (part number
395380-001), which is included in the Cross Link Kit. Follow the instructions in this
guide for each cabinet, then follow the instructions in the poster to connect the cabinets.
HP StorageWorks ESL E-Series Tape Library unpacking and installation guide
41
Содержание StorageWorks ESL E Series
Страница 8: ...8 ...
Страница 72: ...72 Loading tape cartridges ...