Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Camera
24(1/2)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Pull out the cable from the hooks marked in
white circles (Fig. 1).
2. Unscrew (Torx Pin-Head
×
2) all joints of
Camera (Fig. 1).
Torsion: 4.0
±
1.0 kgf.cm
Take the screwdriver vertically to the screw
holes.
Fig. 1
Electric Screwdriver (S-4000MS)
Screw