Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No. : Pyxis400
DISASS’Y SOP Station :
Operation Name : Ver. :
Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Top Vent
11(1/1)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
Fig. 1
Electric Screwdriver (S-4000MS)
1
2
4
3
5
1. Unscrew (Torx Pin-Head
×
5) all joints of Top
Vent (Fig. 1).
Torsion: 4.0
±
1.0 kgf.cm
Take the screwdriver vertically to the screw
holes.
2. Follow the direction of the red arrow to take
out Top Vent (Fig. 1).
Take out Top Vent moderately to prevent
damaging it.